ACCA Applied Knowledge · Management Accounting
Budgetary control and reporting: formula sheet
Key formulas
- Variance
- Variance = Flexed budget − Actual (for costs); Actual − Flexed budget (for revenue and profit)
- A positive result is favourable, a negative result is adverse. Check the sign by asking: did profit go up or down?
- Flexed budget – variable cost
- Flexed variable cost = Budget cost per unit × Actual activity
- Use the budgeted unit cost, not the actual unit cost.
- Flexed budget – fixed cost
- Flexed fixed cost = Original budgeted fixed cost
- Fixed costs are not flexed within the relevant range. Semi-variable costs must be split into fixed and variable parts first.
- Sales volume effect on profit
- Volume variance in profit = (Actual units − Budget units) × Budget profit or contribution per unit
- This is the gap between the fixed budget and the flexed budget. It is not a cost control failure.
- Variance as a percentage
- Variance % = Variance ÷ Flexed budget × 100
- Used to decide whether a variance is big enough to investigate.
- Budgeted variable cost per unit
- Budgeted variable cost per unit = Budgeted variable cost ÷ Budgeted activity
- Use the original budget and its original activity level.
- Flexed variable cost
- Flexed variable cost = Budgeted variable cost per unit × Actual activity
- Activity can be units, hours or sales volume, whichever the cost depends on.
- Flexed fixed cost
- Flexed fixed cost = Original budgeted fixed cost
- Fixed costs are not flexed, assuming activity stays in the relevant range.
- Flexed semi-variable cost
- Fixed element + (variable rate per unit × Actual activity)
- Split the cost first, for example using the high-low method.
- Variance against flexed budget
- Variance = Flexed budget figure − Actual figure (for costs)
- A cost lower than flexed budget is favourable (F). A higher cost is adverse (A). For revenue, actual above flexed budget is favourable.
- Basic variance
- Variance = Actual − Budget (or flexed budget)
- Then decide F or A by the effect on profit, not by the sign.
- Revenue or profit variance rule
- Actual revenue or profit higher than budget = F; lower = A
- Higher income increases profit.
- Cost variance rule
- Actual cost higher than budget = A; lower = F
- Higher cost reduces profit.
- Flexed budget cost
- Flexed variable cost = Budget variable cost per unit × actual units; fixed cost unchanged
- Flex only variable costs. Fixed costs stay at the original budget.
- Sales volume profit variance
- (Actual units − Budget units) × standard profit per unit
- Use standard contribution per unit if marginal costing is used. Use standard profit per unit if absorption costing is used. More units than budget is F.
- Sales price variance
- Actual revenue − (Actual units × budget price)
- Positive result is F.
- Controllability test
- Controllable cost = a cost the named manager can influence in the stated period
- Always ask: which manager, and which time period?
- Controllable profit of a centre
- Controllable profit = Revenue − Controllable costs
- Excludes allocated head office costs and other items the manager cannot influence.
- Reporting rule
- Manager's performance report = Controllable items only
- Uncontrollable items may be shown separately for information, below the controllable result.
- Budgetary slack
- Slack = budgeted cost agreed − realistic cost estimate
- Slack is the deliberate overstatement of costs or understatement of revenues. It is a behavioural concept, not a required calculation.
- Variance
- Variance = actual − budget (or budget − actual), then label as favourable (F) or adverse (A)
- Higher revenue or lower cost than budget is favourable. Always compare against a flexed budget where activity differs.
- Qualities of a good budget report
- Timely, accurate, clear, relevant, controllable items, exception-based
- Use as a checklist when asked to assess or improve a report.
- Responsibility centre scope
- Cost centre = costs; revenue centre = revenue; profit centre = revenue and costs; investment centre = profit and capital invested
- Match the centre to the manager's control.
Quick revision
- Budgetary control: compare actual with budget, investigate variances, take action.
- A fixed budget is set for one activity level. A flexed budget is restated for actual activity.
- Flexed variable cost = budgeted variable cost per unit × actual units.
- Fixed costs stay the same in a flexed budget as long as activity stays within the relevant range.
- Variance = flexed budget − actual for costs: a positive result is favourable.
- For revenue and profit, actual above the flexed budget is favourable.
- Favourable (F) means profit is higher than budgeted. Adverse (A) means it is lower.
- A variance is a prompt to investigate, not proof of poor performance.
- A controllable cost can be significantly influenced by the manager being assessed. Hold managers responsible for these.
- Uncontrollable costs should be reported separately or excluded when judging a manager.
- Budgets motivate when targets are challenging but achievable and managers take part in setting them.
- Budget slack is deliberate padding of budgeted costs or understating of revenue.
Common mistakes
- Comparing actual cost with the original fixed budget Fix: Always check whether actual activity equals budget activity. If not, flex first.
- Flexing fixed costs Fix: Only variable costs move with activity. Keep fixed costs at the budgeted total.
- Flexing fixed costs along with variable costs. Fix: Classify each line first. Only variable costs and revenue change with activity. Fixed costs stay at the original budget.
- Comparing actual results with the original fixed budget and calling the variance performance. Fix: Flex the budget to actual activity first. Compare actual with flexed budget to judge cost control.
- Comparing actual costs with the original budget when activity level differs. Fix: Flex the variable costs to actual output first. Then compare.
- Labelling variances by size instead of effect on profit. Fix: For revenue, higher is F. For costs, higher is A. Ask what happens to profit.
- Treating all fixed costs as uncontrollable. Fix: Fixed costs are uncontrollable only if the manager has no say. A manager who decides on staffing or advertising controls those fixed costs.
- Treating all variable costs as controllable. Fix: Check who sets the price or rate. A supplier price rise in the market is outside the manager's control, even though the cost is variable.
- Saying participation always improves motivation. Fix: State that participation tends to help but can cause slack, delay or pseudo-participation.
- Confusing budgetary slack with a contingency or prudent estimate. Fix: Slack is deliberate, hidden and for the manager's benefit. A contingency is open and justified.
Exam tips
- Look for the words flexed or flexible in the question. If activity differs, a fixed budget comparison is wrong.
- In multiple response questions about reports, expect statements on timeliness, controllability and management by exception. Pick the ones that match those ideas.
- In number entry, check whether the answer needs a sign, F or A, or is just a magnitude. Follow the instruction exactly.
- Do a quick sense check: more units at a fixed price should raise revenue, and extra costs should reduce profit.
- Section B questions on budgeting often ask you to comment as well as calculate. Name a likely cause and a sensible action in one sentence each.
- In Section A, read whether the question asks for a flexed figure or a variance. Many wrong answers come from stopping one step early.
- For multiple response questions, check each statement separately. Remember fixed costs do not change in a flexed budget and a fixed budget cannot show a true performance variance.
- Write the rate per unit on your scratch paper before multiplying. It prevents slips in number entry questions.