Cost reductions and value enhancement: formula sheet

Full chapter guide

Key formulas

Cost control
Variance = Standard (or budget) cost − Actual cost
Used to spot deviations from a set standard. A positive result is favourable when it compares costs. Action is aimed at returning to the standard.
Cost reduction
Cost saving per unit = Old unit cost − New unit cost
Only a true reduction if quality and fitness for purpose are maintained. The standard cost is then revised.
Target cost gap
Cost gap = Current expected cost − Target cost
Target cost = Target selling price − Target profit. The gap is the amount cost reduction must achieve.
Value (concept)
Value = Function (benefit to customer) ÷ Cost
A conceptual ratio, not a number you calculate. Value rises if function is kept and cost falls, or if function rises at the same cost.
Target cost gap
Cost gap = Estimated cost − Target cost
Value engineering aims to close this gap before production. Target cost = target selling price − required profit margin.
Saving from a change
Saving per unit = Old cost per unit − New cost per unit; total saving = saving per unit × units
Use this to test whether a proposed change is worthwhile. Include any extra costs the change creates.
Timing rule
Value engineering = before production (design stage); value analysis = existing product
This is the usual exam distinction between the two.
Economy
Economy = actual cost of inputs compared with planned or benchmark cost of inputs
Spending less for the same quality. Example: a lower price per kg of material of the same grade.
Efficiency
Efficiency = output ÷ input
Compare with a standard or earlier period. Example: units per labour hour or cost per unit of output.
Effectiveness
Effectiveness = actual outcome achieved compared with the objective or target
Example: percentage of patients treated within the target waiting time.
Value for money
VFM = economy + efficiency + effectiveness (all three together)
Not a numeric formula. Good VFM needs all three, not just one.
Target cost
Target cost = Target selling price − Target profit
If profit is given as a margin on selling price, target profit = price × margin %. If it is a mark-up on cost, work from cost instead: cost = price ÷ (1 + mark-up).
Cost gap
Cost gap = Estimated cost − Target cost
A positive gap means the product is too expensive and savings are needed. Zero or negative means the target is met.
Kaizen cost target
New target cost = Previous cost × (1 − reduction %)
Applied each period. Reductions compound, so two 2% cuts are not a 4% cut.
Target costing vs kaizen
Target costing: design stage. Kaizen: production stage.
Learn this contrast, as it is the most common exam point.

Quick revision

  • Cost control keeps costs within a set standard or budget.
  • Cost reduction lowers unit costs permanently without harming quality or suitability for the purpose.
  • Value analysis reviews an existing product to remove cost that adds no value.
  • Value engineering does the same at the design stage, before production.
  • Both techniques aim to keep or improve the product's function while lowering cost.
  • Target cost = target selling price − required profit.
  • Cost gap = estimated cost − target cost. A positive gap means cost must come down.
  • Target costing starts with the market price, not with the cost of production.
  • Kaizen means small, continuous improvements made by all employees.
  • Value for money combines economy, efficiency and effectiveness.
  • Economy is spending less, efficiency is getting more output per input, and effectiveness is achieving the objectives.

Common mistakes

  • Treating the two terms as the same thing. Fix: Control keeps costs at the standard. Reduction lowers the standard. Write that one line at the start of your notes.
  • Calling any cost cut a cost reduction. Fix: A true cost reduction keeps fitness for purpose. Cheaper materials that make the product worse are a cut that may harm sales.
  • Treating value engineering as plain cost cutting. Fix: Remember that function and quality must be kept. Any option that harms what the customer needs is not value engineering.
  • Swapping the definitions of value analysis and value engineering. Fix: Link engineering with design (before production) and analysis with reviewing what exists. Use the timing test.
  • Treating economy and efficiency as the same thing. Fix: Economy is the price of inputs. Efficiency is the output you get from inputs. Look for a ratio of output to input.
  • Calling a cost cut effective. Fix: Effectiveness means meeting objectives. A cost cut with no link to the objective is economy or efficiency.
  • Adding profit to cost to get the price. Fix: In target costing the price comes first. Always compute price − profit.
  • Treating a mark-up on cost as a margin on price. Fix: Read the wording. Margin is on selling price. Mark-up is on cost, so divide price by (1 + mark-up).

Exam tips

  • Watch the key verbs. Words like monitor, compare with standard and take corrective action point to control. Words like redesign, eliminate and lower the standard point to reduction.
  • Always check the quality condition when an option mentions cheaper inputs.
  • In number entry questions, work out target cost first, then the gap. Enter the figure in the unit asked for, per unit or in total.
  • In multiple response questions, read how many answers to select and rank each option as control or reduction before choosing.
  • Link the topic to target costing, value analysis and kaizen, since these are the usual reduction examples.
  • Decide first whether the product exists yet. This answers most definition questions.
  • Check every option for the phrase function or quality being kept. Options that reduce quality are usually wrong.
  • In number questions, include extra costs from the change, then scale to the volume asked.