ACCA Applied Knowledge · Management Accounting
Cost reductions and value enhancement: formula sheet
Key formulas
- Cost control
- Variance = Standard (or budget) cost − Actual cost
- Used to spot deviations from a set standard. A positive result is favourable when it compares costs. Action is aimed at returning to the standard.
- Cost reduction
- Cost saving per unit = Old unit cost − New unit cost
- Only a true reduction if quality and fitness for purpose are maintained. The standard cost is then revised.
- Target cost gap
- Cost gap = Current expected cost − Target cost
- Target cost = Target selling price − Target profit. The gap is the amount cost reduction must achieve.
- Value (concept)
- Value = Function (benefit to customer) ÷ Cost
- A conceptual ratio, not a number you calculate. Value rises if function is kept and cost falls, or if function rises at the same cost.
- Target cost gap
- Cost gap = Estimated cost − Target cost
- Value engineering aims to close this gap before production. Target cost = target selling price − required profit margin.
- Saving from a change
- Saving per unit = Old cost per unit − New cost per unit; total saving = saving per unit × units
- Use this to test whether a proposed change is worthwhile. Include any extra costs the change creates.
- Timing rule
- Value engineering = before production (design stage); value analysis = existing product
- This is the usual exam distinction between the two.
- Economy
- Economy = actual cost of inputs compared with planned or benchmark cost of inputs
- Spending less for the same quality. Example: a lower price per kg of material of the same grade.
- Efficiency
- Efficiency = output ÷ input
- Compare with a standard or earlier period. Example: units per labour hour or cost per unit of output.
- Effectiveness
- Effectiveness = actual outcome achieved compared with the objective or target
- Example: percentage of patients treated within the target waiting time.
- Value for money
- VFM = economy + efficiency + effectiveness (all three together)
- Not a numeric formula. Good VFM needs all three, not just one.
- Target cost
- Target cost = Target selling price − Target profit
- If profit is given as a margin on selling price, target profit = price × margin %. If it is a mark-up on cost, work from cost instead: cost = price ÷ (1 + mark-up).
- Cost gap
- Cost gap = Estimated cost − Target cost
- A positive gap means the product is too expensive and savings are needed. Zero or negative means the target is met.
- Kaizen cost target
- New target cost = Previous cost × (1 − reduction %)
- Applied each period. Reductions compound, so two 2% cuts are not a 4% cut.
- Target costing vs kaizen
- Target costing: design stage. Kaizen: production stage.
- Learn this contrast, as it is the most common exam point.
Quick revision
- Cost control keeps costs within a set standard or budget.
- Cost reduction lowers unit costs permanently without harming quality or suitability for the purpose.
- Value analysis reviews an existing product to remove cost that adds no value.
- Value engineering does the same at the design stage, before production.
- Both techniques aim to keep or improve the product's function while lowering cost.
- Target cost = target selling price − required profit.
- Cost gap = estimated cost − target cost. A positive gap means cost must come down.
- Target costing starts with the market price, not with the cost of production.
- Kaizen means small, continuous improvements made by all employees.
- Value for money combines economy, efficiency and effectiveness.
- Economy is spending less, efficiency is getting more output per input, and effectiveness is achieving the objectives.
Common mistakes
- Treating the two terms as the same thing. Fix: Control keeps costs at the standard. Reduction lowers the standard. Write that one line at the start of your notes.
- Calling any cost cut a cost reduction. Fix: A true cost reduction keeps fitness for purpose. Cheaper materials that make the product worse are a cut that may harm sales.
- Treating value engineering as plain cost cutting. Fix: Remember that function and quality must be kept. Any option that harms what the customer needs is not value engineering.
- Swapping the definitions of value analysis and value engineering. Fix: Link engineering with design (before production) and analysis with reviewing what exists. Use the timing test.
- Treating economy and efficiency as the same thing. Fix: Economy is the price of inputs. Efficiency is the output you get from inputs. Look for a ratio of output to input.
- Calling a cost cut effective. Fix: Effectiveness means meeting objectives. A cost cut with no link to the objective is economy or efficiency.
- Adding profit to cost to get the price. Fix: In target costing the price comes first. Always compute price − profit.
- Treating a mark-up on cost as a margin on price. Fix: Read the wording. Margin is on selling price. Mark-up is on cost, so divide price by (1 + mark-up).
Exam tips
- Watch the key verbs. Words like monitor, compare with standard and take corrective action point to control. Words like redesign, eliminate and lower the standard point to reduction.
- Always check the quality condition when an option mentions cheaper inputs.
- In number entry questions, work out target cost first, then the gap. Enter the figure in the unit asked for, per unit or in total.
- In multiple response questions, read how many answers to select and rank each option as control or reduction before choosing.
- Link the topic to target costing, value analysis and kaizen, since these are the usual reduction examples.
- Decide first whether the product exists yet. This answers most definition questions.
- Check every option for the phrase function or quality being kept. Options that reduce quality are usually wrong.
- In number questions, include extra costs from the change, then scale to the volume asked.