ACCA Applied Knowledge · Management Accounting
Flexible budgets: formula sheet
Key formulas
- Flexed variable cost
- Flexed variable cost = budgeted variable cost per unit × actual activity
- Use the budgeted rate per unit of activity, not the actual rate.
- Flexed fixed cost
- Flexed fixed cost = original budgeted fixed cost
- Unchanged within the relevant range of activity.
- Semi-variable cost
- Total cost = fixed element + (variable rate × activity)
- Split it first, then flex only the variable part.
- Variance for control
- Variance = actual result − flexed budget
- For costs, actual above flexed budget is adverse. For sales and profit, actual above flexed is favourable.
- Total cost
- Total cost = Fixed cost + (Variable cost per unit × Activity level)
- Applies to semi-variable costs. Fixed cost is the intercept, variable cost per unit is the slope.
- High-low variable cost per unit
- Variable cost per unit = (Cost at highest activity − Cost at lowest activity) ÷ (Highest activity − Lowest activity)
- Use the highest and lowest activity levels, not the highest and lowest costs, unless they coincide.
- High-low fixed cost
- Fixed cost = Total cost at either level − (Variable cost per unit × Activity at that level)
- Check by using the other activity level. You should get the same answer.
- Flexed variable cost
- Flexed variable cost = Budgeted variable cost per unit × Actual activity
- Equivalent to budgeted variable cost × (actual activity ÷ budgeted activity).
- Flexed budget cost for a semi-variable item
- Flexed cost = Fixed element + (Variable rate × Actual activity)
- Do not scale the whole semi-variable cost by activity. Only the variable part moves.
- Variable cost per unit
- Variable cost per unit = Budgeted variable cost ÷ Budgeted activity
- Find this from the original budget before you flex.
- Flexed variable cost
- Flexed variable cost = Variable cost per unit × Actual activity
- Use actual activity, not budgeted activity.
- Flexed fixed cost
- Flexed fixed cost = Original budgeted fixed cost
- Fixed costs do not change within the relevant range of activity.
- Semi-variable cost
- Total cost = Fixed element + (Variable rate × Activity)
- Split the cost first, often with the high-low method, then flex the variable part only.
- Flexed budget variance
- Variance = Flexed budget − Actual cost (or the reverse for income)
- Costs: actual below flexed budget is favourable. Income: actual above flexed budget is favourable.
- Flexed budget for a variable cost
- Flexed cost = budgeted cost per unit × actual activity
- Or budgeted cost ÷ budgeted activity × actual activity.
- Flexed budget for a fixed cost
- Flexed fixed cost = original budgeted fixed cost
- Do not flex fixed costs unless the question says they step up.
- Cost variance
- Cost variance = Flexed budget cost − Actual cost
- Positive = favourable. Negative = adverse.
- Revenue or profit variance
- Variance = Actual − Flexed budget
- Positive = favourable. Negative = adverse.
- Volume variance (fixed to flexed)
- Flexed budget profit − Original budget profit
- Shows the effect of activity level only.
- Semi-variable cost
- Flexed cost = fixed element + (variable rate × actual activity)
- Split the cost first if only totals are given.
Quick revision
- A fixed budget is set for one activity level and is not changed.
- A flexible budget is restated for the actual activity level.
- Variable cost per unit stays constant; total variable cost changes with activity.
- Total fixed cost stays constant within the relevant range.
- Semi-variable cost = fixed part + variable part.
- High-low: variable rate = (high cost − low cost) ÷ (high activity − low activity).
- Fixed part = total cost − (variable rate × activity), using either the high or low point.
- Flexed budget = variable cost per unit × actual activity + budgeted fixed cost.
- Variance = actual result − flexed budget, then judge whether it is F or A.
- Higher actual revenue than flexed is favourable; higher actual cost than flexed is adverse.
- Compare actual with flexed budget for control, not with the original budget.
- Check the activity measure and units in the question before you calculate.
Common mistakes
- Flexing fixed costs along with variable costs. Fix: Only scale variable costs. Keep fixed costs at the original figure.
- Comparing actual costs with the original fixed budget for control. Fix: Flex the budget to actual activity first, then compare.
- Flexing the whole of a semi-variable cost in proportion to activity. Fix: Split it first. Flex only the variable element and keep the fixed element unchanged.
- Using the highest and lowest cost figures instead of the highest and lowest activity levels in the high-low method. Fix: Always choose the periods with the highest and lowest activity. Take the costs that go with them.
- Flexing fixed costs along with variable costs. Fix: Classify every line first. Only variable parts move with activity.
- Using actual cost figures to calculate the rate per unit. Fix: Always calculate the rate from the original budget and then multiply by actual activity.
- Comparing actual results with the original fixed budget and calling the gap a variance. Fix: Always check whether actual and budget activity match. If not, flex first.
- Flexing fixed costs along with variable costs. Fix: Scale only variable and the variable part of semi-variable costs. Keep fixed costs as budgeted.
Exam tips
- Read the question for the word 'flexed' or 'actual activity'. It tells you to scale variable costs.
- In multiple response questions, check each statement against the rule: fixed budgets do not change, flexible budgets adjust for activity.
- In number entry questions, show the per-unit rate on scrap paper first. It catches most arithmetic slips.
- Check the sign and label of every variance before you submit.
- Read the activity measure carefully. A question may flex on labour hours rather than units produced.
- In multiple response questions, check each statement against the definition. Fixed cost per unit falls as activity rises, but total fixed cost does not change within the relevant range.
- For number entry questions, give the answer in the units asked for, such as $ or ₹, and do not round until the final step.
- Sketch a quick graph in your head for stepped costs. The cost is flat, then jumps, then flat again.