Skip to content

ACCA Applied Knowledge · Management Accounting

Flexible budgets: formula sheet

Full chapter guide

Key formulas

Flexed variable cost
Flexed variable cost = budgeted variable cost per unit × actual activity
Use the budgeted rate per unit of activity, not the actual rate.
Flexed fixed cost
Flexed fixed cost = original budgeted fixed cost
Unchanged within the relevant range of activity.
Semi-variable cost
Total cost = fixed element + (variable rate × activity)
Split it first, then flex only the variable part.
Variance for control
Variance = actual result − flexed budget
For costs, actual above flexed budget is adverse. For sales and profit, actual above flexed is favourable.
Total cost
Total cost = Fixed cost + (Variable cost per unit × Activity level)
Applies to semi-variable costs. Fixed cost is the intercept, variable cost per unit is the slope.
High-low variable cost per unit
Variable cost per unit = (Cost at highest activity − Cost at lowest activity) ÷ (Highest activity − Lowest activity)
Use the highest and lowest activity levels, not the highest and lowest costs, unless they coincide.
High-low fixed cost
Fixed cost = Total cost at either level − (Variable cost per unit × Activity at that level)
Check by using the other activity level. You should get the same answer.
Flexed variable cost
Flexed variable cost = Budgeted variable cost per unit × Actual activity
Equivalent to budgeted variable cost × (actual activity ÷ budgeted activity).
Flexed budget cost for a semi-variable item
Flexed cost = Fixed element + (Variable rate × Actual activity)
Do not scale the whole semi-variable cost by activity. Only the variable part moves.
Variable cost per unit
Variable cost per unit = Budgeted variable cost ÷ Budgeted activity
Find this from the original budget before you flex.
Flexed variable cost
Flexed variable cost = Variable cost per unit × Actual activity
Use actual activity, not budgeted activity.
Flexed fixed cost
Flexed fixed cost = Original budgeted fixed cost
Fixed costs do not change within the relevant range of activity.
Semi-variable cost
Total cost = Fixed element + (Variable rate × Activity)
Split the cost first, often with the high-low method, then flex the variable part only.
Flexed budget variance
Variance = Flexed budget − Actual cost (or the reverse for income)
Costs: actual below flexed budget is favourable. Income: actual above flexed budget is favourable.
Flexed budget for a variable cost
Flexed cost = budgeted cost per unit × actual activity
Or budgeted cost ÷ budgeted activity × actual activity.
Flexed budget for a fixed cost
Flexed fixed cost = original budgeted fixed cost
Do not flex fixed costs unless the question says they step up.
Cost variance
Cost variance = Flexed budget cost − Actual cost
Positive = favourable. Negative = adverse.
Revenue or profit variance
Variance = Actual − Flexed budget
Positive = favourable. Negative = adverse.
Volume variance (fixed to flexed)
Flexed budget profit − Original budget profit
Shows the effect of activity level only.
Semi-variable cost
Flexed cost = fixed element + (variable rate × actual activity)
Split the cost first if only totals are given.

Quick revision

  • A fixed budget is set for one activity level and is not changed.
  • A flexible budget is restated for the actual activity level.
  • Variable cost per unit stays constant; total variable cost changes with activity.
  • Total fixed cost stays constant within the relevant range.
  • Semi-variable cost = fixed part + variable part.
  • High-low: variable rate = (high cost − low cost) ÷ (high activity − low activity).
  • Fixed part = total cost − (variable rate × activity), using either the high or low point.
  • Flexed budget = variable cost per unit × actual activity + budgeted fixed cost.
  • Variance = actual result − flexed budget, then judge whether it is F or A.
  • Higher actual revenue than flexed is favourable; higher actual cost than flexed is adverse.
  • Compare actual with flexed budget for control, not with the original budget.
  • Check the activity measure and units in the question before you calculate.

Common mistakes

  • Flexing fixed costs along with variable costs. Fix: Only scale variable costs. Keep fixed costs at the original figure.
  • Comparing actual costs with the original fixed budget for control. Fix: Flex the budget to actual activity first, then compare.
  • Flexing the whole of a semi-variable cost in proportion to activity. Fix: Split it first. Flex only the variable element and keep the fixed element unchanged.
  • Using the highest and lowest cost figures instead of the highest and lowest activity levels in the high-low method. Fix: Always choose the periods with the highest and lowest activity. Take the costs that go with them.
  • Flexing fixed costs along with variable costs. Fix: Classify every line first. Only variable parts move with activity.
  • Using actual cost figures to calculate the rate per unit. Fix: Always calculate the rate from the original budget and then multiply by actual activity.
  • Comparing actual results with the original fixed budget and calling the gap a variance. Fix: Always check whether actual and budget activity match. If not, flex first.
  • Flexing fixed costs along with variable costs. Fix: Scale only variable and the variable part of semi-variable costs. Keep fixed costs as budgeted.

Exam tips

  • Read the question for the word 'flexed' or 'actual activity'. It tells you to scale variable costs.
  • In multiple response questions, check each statement against the rule: fixed budgets do not change, flexible budgets adjust for activity.
  • In number entry questions, show the per-unit rate on scrap paper first. It catches most arithmetic slips.
  • Check the sign and label of every variance before you submit.
  • Read the activity measure carefully. A question may flex on labour hours rather than units produced.
  • In multiple response questions, check each statement against the definition. Fixed cost per unit falls as activity rises, but total fixed cost does not change within the relevant range.
  • For number entry questions, give the answer in the units asked for, such as $ or ₹, and do not round until the final step.
  • Sketch a quick graph in your head for stepped costs. The cost is flat, then jumps, then flat again.