Target costing: formula sheet

Full chapter guide

Key formulas

Target cost
Target cost = Target selling price − Required profit
Required profit can be given as an amount per unit or as a percentage of selling price. If it is a percentage of cost, convert it carefully.
Target cost gap
Target cost gap = Estimated cost − Target cost
A positive figure means cost must fall. If it is negative, the estimate is already below target.
Profit as a percentage of selling price
Required profit = Selling price × margin %
Use this when the question gives a margin on sales.
Profit as a mark-up on cost
Target cost = Selling price ÷ (1 + mark-up %)
Use this when the profit is given as a percentage of cost, not of price.
Target cost
Target cost = Target selling price − Target profit
Profit may be given as a margin on price or as a required return. Read the wording carefully.
Target cost gap
Cost gap = Estimated cost − Target cost
A positive figure is a shortfall that must be closed. A negative figure means the target is already met.
Gap as a percentage
Cost reduction needed % = Cost gap ÷ Estimated cost × 100
Use this to judge how hard the gap is to close and to spread reductions across components.
Revised estimated cost
Revised cost = Original estimate − Savings from each action
Check whether the total savings are at least equal to the gap.
Target cost
Target cost = Target selling price − Target profit
Profit may be given as a margin on price or as a required return. Read which.
Target cost gap
Gap = Estimated cost − Target cost
A positive figure is a shortfall that needs closing. Do this per unit or in total, but be consistent.
Learning curve
Y = a × X^b
Y = cumulative average time (or cost) per unit for X units. a = time for the first unit. X = cumulative units.
Index of learning
b = log r ÷ log 2
r is the learning rate as a decimal, for example 0.8 for 80%. b is negative.
Doubling shortcut
Average after doubling = Previous average × r
Works only when output doubles: 1, 2, 4, 8, 16 and so on. Use it to avoid logs.
Total time
Total time for X units = Cumulative average time × X
Multiply by the labour rate per hour to get total labour cost.
Incremental time
Time for units (m+1) to n = Total for n units − Total for m units
Use this when the question asks about a later batch, not all units from the start.
Finding the rate
r = Average time at 2n units ÷ Average time at n units
Use the doubling relationship. If output rises four-fold, r² = ratio of averages.
Target cost
Target cost = Target selling price − Target profit
Target profit may be a margin on price or a mark-up on cost. Read the question to see which.
Target cost gap
Cost gap = Estimated cost − Target cost
A positive figure means the cost must be reduced. Zero or negative means the target is already met.
Cost-plus price
Price = Full cost + (Full cost × mark-up %)
Mark-up is on cost. A margin is on selling price. Do not mix them.
Margin to mark-up
Profit margin of m% on price equals a mark-up of m ÷ (100 − m) on cost
For example, a 20% margin on price equals a 25% mark-up on cost.

Quick revision

  • Target cost = target selling price − required profit.
  • Cost gap = current estimated cost − target cost. A positive gap means cost is too high.
  • Target costing is market-led: price comes first, cost is the thing to be managed.
  • The process starts at design stage, when most of a product's cost is committed.
  • Ways to close the gap: value engineering, cheaper materials, simpler design, fewer components, process change, supplier negotiation.
  • Value engineering aims to remove cost without reducing value the customer pays for.
  • Learning curve effects usually reduce labour time per unit, so labour cost in the estimate falls as output grows.
  • Check whether the learning rate applies to cumulative average time or to marginal time as the question states.
  • Target costing differs from cost-plus, which builds price up from cost and margin.
  • Kaizen costing seeks continuous small savings during production, while target costing acts mainly before launch.
  • Evaluate: it focuses on customers and cost early, but it can cause stress, delay and lower quality if the gap is too hard.
  • In a written answer, apply points to the scenario's product and figures.

Common mistakes

  • Treating a profit mark-up on cost as a margin on selling price. Fix: Read the base. Margin on price: deduct % of price. Mark-up on cost: divide price by (1 + %).
  • Calculating the gap as target cost minus estimated cost. Fix: Always use estimated cost minus target cost. A positive result means a shortfall to be closed.
  • Calculating the gap the wrong way round Fix: Always write estimated cost minus target cost. A positive answer means a problem.
  • Treating profit as a percentage of cost when it is a percentage of price Fix: Margin is on selling price, mark-up is on cost. Underline the base before calculating.
  • Applying the learning rate to the total cost, including materials. Fix: Apply the curve to labour hours only. Add materials and fixed overheads at their normal amounts unless told otherwise.
  • Treating 80% as a fall of 80%, so multiplying the time by 0.2. Fix: An 80% rate means the average becomes 80% of the previous figure each time output doubles. Multiply by 0.8.
  • Treating a profit margin as a mark-up on cost. Fix: A margin is a percentage of price. A mark-up is a percentage of cost. Re-read the wording and convert if needed.
  • Saying target costing starts with the cost of the product. Fix: Remember that the price comes first. Cost is the result, not the starting point.

Exam tips

  • Check at once whether profit is a margin on price or a mark-up on cost. Examiners use both.
  • In OT questions, work out the target cost first and then the gap, because the options often include the wrong subtraction.
  • In written answers, link each cost-reduction idea to the scenario. Say what it does to cost and what risk it carries for quality or sales.
  • Be ready to explain why target costing suits competitive markets, and that it focuses on the design stage.
  • Show the layout in Section C: price, profit, target cost, estimated cost, gap. Method marks are available even if a figure is wrong.
  • Do the target cost and gap calculation first, even if the question seems to ask only for discussion. It anchors your answer.
  • Check whether a percentage is applied to price, cost, or one cost element. Many marks are lost on the wrong base.
  • In written parts, link each method to a cost in the scenario and state a risk, such as lower quality or supplier dependence.