ACCA Strategic Professional · Strategic Business Leader
Cost and management accounting: formula sheet
Key formulas
- Total cost
- Total cost = Fixed cost + (Variable cost per unit × Activity level)
- Valid only within the relevant range. Use it for forecasting once you have the split.
- High-low: variable cost per unit
- Variable cost per unit = (Cost at highest activity − Cost at lowest activity) ÷ (Highest activity − Lowest activity)
- Use the highest and lowest activity levels, not the highest and lowest costs. Both must be within the relevant range.
- High-low: fixed cost
- Fixed cost = Total cost at either activity level − (Variable cost per unit × that activity level)
- Using the high or low point gives the same answer.
- Fixed cost per unit
- Fixed cost per unit = Total fixed cost ÷ Activity level
- Falls as activity rises. Total fixed cost does not change.
- Prime cost
- Prime cost = Direct materials + Direct labour + Direct expenses
- Adding indirect production costs gives total production cost.
- Overhead absorption rate (OAR)
- OAR = budgeted production overhead ÷ budgeted activity level (e.g. labour hours or machine hours)
- Use budgeted figures for both. Pick the basis that best drives the overhead.
- Overhead absorbed
- Overhead absorbed = OAR × actual activity
- Compare with actual overhead to find under- or over-absorption.
- Under/over-absorption
- Over/(under)-absorbed = overhead absorbed − actual overhead incurred
- Under-absorption is added to cost of sales, over-absorption is deducted from it.
- Contribution
- Contribution = sales − variable costs
- Marginal costing profit = total contribution − fixed costs for the period.
- Profit difference between methods
- Absorption profit − marginal profit = change in inventory units × fixed overhead absorbed per unit
- Absorption profit is higher when inventory rises and lower when inventory falls. Assumes the same fixed overhead rate per unit in the period.
- ABC cost driver rate
- Cost driver rate = cost of activity pool ÷ total driver volume
- Product overhead = Σ (driver rate × driver units used by that product).
- Material price variance
- (Standard price − Actual price) × Actual quantity purchased
- Positive = favourable. Use quantity purchased if materials are recorded at standard on purchase; otherwise quantity used.
- Material usage variance
- (Standard quantity for actual output − Actual quantity used) × Standard price
- Positive = favourable.
- Labour rate variance
- (Standard rate − Actual rate) × Actual hours paid
- Positive = favourable.
- Labour efficiency variance
- (Standard hours for actual output − Actual hours worked) × Standard rate
- Positive = favourable.
- Idle time variance
- Idle hours × Standard rate
- Always adverse. Efficiency is then based on hours worked, not hours paid.
- Variable overhead variances
- Expenditure = (Standard rate × Actual hours) − Actual cost; Efficiency = (Standard hours for actual output − Actual hours) × Standard rate
- Positive = favourable.
- Fixed overhead expenditure variance
- Budgeted fixed overhead − Actual fixed overhead
- Positive = favourable.
- Fixed overhead volume variance (absorption costing)
- (Actual output − Budgeted output) × Standard fixed overhead per unit
- Positive = favourable. Not used under marginal costing.
- Sales price variance
- (Actual price − Standard price) × Actual units sold
- Positive = favourable.
- Sales volume variance
- (Actual units sold − Budgeted units) × Standard profit per unit
- Use standard contribution per unit under marginal costing. Positive = favourable.
- Reconciliation
- Budgeted profit ± sales variances ± cost variances = Actual profit
- Adverse variances reduce profit.
- Budget variance
- Variance = Actual − Budget (label as favourable or adverse)
- Favourable if it raises profit. Adverse if it lowers profit. Always state which.
- Incremental budget
- New budget = Last period base × (1 + inflation) ± known changes
- Check whether the base is last budget or last actual.
- Flexed budget
- Flexed budget = Budgeted cost per unit × actual activity (variable costs); fixed costs unchanged
- Compare actual with the flexed budget, not the original, to judge cost control.
- Rolling budget
- Each period: drop the period just ended, add a new period at the end
- Keeps a constant forecast horizon, such as 12 months.
- Relevant cost test
- Relevant = future + cash + incremental (differs between options)
- Exclude sunk costs, committed costs, depreciation and unchanged overheads.
- Contribution per unit
- Selling price per unit − variable cost per unit
- Variable cost includes direct materials, direct labour if truly variable, and variable overheads.
- Break-even point (units)
- Fixed costs ÷ contribution per unit
- Use the weighted average contribution for a multi-product mix with a fixed sales mix.
- Break-even point (sales value)
- Fixed costs ÷ contribution to sales ratio
- Contribution to sales ratio = contribution ÷ selling price.
- Target profit volume
- (Fixed costs + target profit) ÷ contribution per unit
- Useful for what-if questions.
- Margin of safety
- (Budgeted sales − break-even sales) ÷ budgeted sales
- Can be shown in units, value or as a percentage.
- Limiting factor ranking
- Contribution per unit ÷ units of scarce resource per unit
- Rank products highest first and allocate the scarce resource in that order, up to demand.
- Make or buy
- Compare relevant cost of making with the buy-in price
- Make cost uses only avoidable costs. Buy if the buy-in price is lower, subject to non-financial factors.
- Relevant cost of materials
- Replacement cost if the material is regularly used; otherwise higher of resale value and alternative-use value
- Materials with no other use and no resale value cost nil.
- Target cost
- Target cost = Target selling price − Target profit margin
- Cost gap = Estimated current cost − Target cost. A positive gap must be closed.
- Throughput
- Throughput = Sales revenue − Totally variable costs (usually direct materials)
- Labour is normally treated as a fixed cost in the short term.
- Throughput per bottleneck hour
- Return per factory hour = Throughput per unit ÷ Bottleneck hours per unit
- Rank products on this, not on contribution per unit.
- Total factory cost (TPAR input)
- Cost per factory hour = Total factory cost ÷ Total bottleneck hours available
- Factory cost is labour plus overheads, excluding materials.
- Throughput accounting ratio
- TPAR = Return per factory hour ÷ Cost per factory hour
- TPAR above 1 means the product earns more than it costs. Below 1 means it loses money.
- Life cycle cost
- Life cycle cost = Design and development + Production + Marketing + Distribution + Service + Disposal costs
- Discounting may be applied if the question gives a cost of capital.
Quick revision
- Fixed costs stay constant in total across the relevant range, while variable costs change in total with activity.
- Marginal costing treats fixed production overheads as a period cost, while absorption costing includes them in product cost.
- When inventory rises, absorption costing usually reports higher profit than marginal costing. When inventory falls, it reports lower profit.
- Activity-based costing assigns overheads using cost drivers and often changes product profitability and pricing views.
- Variance = actual result compared with standard or budget, labelled favourable or adverse by its effect on profit.
- Always ask why a variance happened. Variances can be linked, such as cheap material causing a usage or quality problem.
- A budget has several roles: planning, coordination, communication, motivation and control.
- Participative budgeting can improve motivation, but it risks slack and takes longer.
- Relevant costs are future, incremental cash flows. Ignore sunk costs, committed costs and non-cash items.
- Include opportunity costs in decisions where resources are scarce.
- Target costing starts with the market price and works back to the cost allowed. Lifecycle costing looks at costs across the whole product life.
- The balanced scorecard looks beyond finance to customers, internal processes and learning and growth.
Common mistakes
- Choosing the highest and lowest costs instead of the highest and lowest activity levels in the high-low method. Fix: Always scan the activity column first. Take the costs that belong to those activity levels, even if they are not the highest or lowest costs.
- Saying fixed cost per unit is fixed. Fix: Total fixed cost is constant in the relevant range. Fixed cost per unit falls as activity rises. Variable cost per unit is constant, but total variable cost rises.
- Using actual overhead or actual hours to calculate the OAR. Fix: Use budgeted overhead divided by budgeted activity. Use actual activity only when absorbing the overhead.
- Including fixed overheads in marginal cost per unit. Fix: Unit cost in marginal costing has variable costs only. Deduct fixed costs once in total.
- Using budgeted output instead of actual output to find the standard quantity. Fix: Always multiply actual units produced by the standard per unit. This gives the flexed standard.
- Getting the sign wrong and calling a variance favourable when it is adverse. Fix: Ask whether actual cost is above or below standard. Higher cost is adverse. For sales, higher revenue or profit is favourable.
- Listing textbook features of incremental, ZBB and rolling budgets without using the scenario. Fix: Tie every point to a named fact in the case, such as a volatile market or a bloated head office.
- Saying ZBB is always better than incremental budgeting. Fix: Weigh its time and cost. Recommend it where costs are discretionary or unchecked, and consider using it only periodically.
- Including depreciation or apportioned fixed overheads as relevant costs. Fix: Ask if the cash will actually change. Depreciation is non-cash and general overheads usually stay the same, so leave them out.
- Using the original purchase price of materials already in stock. Fix: Original cost is sunk. Use replacement cost if the material is used regularly, otherwise the higher of resale value and alternative use value.
Exam tips
- In SBL, cost behaviour is a tool, not a topic on its own. Expect it inside a case task on pricing, restructuring, outsourcing or profitability. Always tie your numbers to the scenario.
- Write the cost equation clearly before forecasting. Markers award method marks, so every step should be visible even if you slip on arithmetic.
- State assumptions out loud: relevant range, linear behaviour, constant prices. A one-line caveat shows scepticism, which supports professional skills marks.
- Comment on the cost structure. A high fixed-cost business has higher operating risk when demand is uncertain. A variable-heavy structure gives flexibility. This is the commercial insight markers look for.
- Do not over-polish numbers. Use the exam's currency, round sensibly, and spend the saved time on the recommendation.
- Show every driver rate and check that the allocated total equals the overhead pool. Markers reward visible workings.
- Always add a short comment after calculations. State what the figures mean for pricing, mix or profitability.
- When asked to evaluate ABC, give both advantages and disadvantages, then tie them to the scenario's business type.