CA Intermediate · Financial Management and Strategic Management
Investment Decisions: formula sheet
Key formulas
- Initial outlay (year 0)
- Initial outlay = Cost of asset + Installation and transport + Net working capital required (+ opportunity cost of any existing asset used) − Sale proceeds of old asset replaced (adjusted for tax)
- Include all cash paid to get the project ready. Do not include sunk costs.
- Depreciation
- Annual depreciation = (Cost − Salvage value) ÷ Life, for straight line
- Use the method the question states. Depreciation is a non-cash charge.
- Operating cash flow (PAT method)
- CFAT = (Sales − Cash costs − Depreciation) × (1 − t) + Depreciation
- Add depreciation back after computing tax. Interest is excluded.
- Operating cash flow (shortcut)
- CFAT = (Sales − Cash costs) × (1 − t) + Depreciation × t
- Same answer as above. Depreciation gives a tax shield of Depreciation × t.
- Terminal cash flow
- Terminal flow = Salvage value − Tax on gain (or + tax saved on loss) + Recovery of working capital
- Tax on salvage depends on the book value and the tax rule given in the question.
- Working capital cash flow
- Cash flow from working capital = −(Increase in NWC) in the year it rises; +Release of NWC at the end
- Only the change in working capital each year is a cash flow.
- Payback period (equal annual inflows)
- Payback = Initial investment ÷ Annual cash inflow
- Use cash inflow after tax, not accounting profit. Add back depreciation.
- Payback period (uneven inflows)
- Payback = Years before recovery + (Unrecovered amount at start of the year ÷ Cash inflow of that year)
- Assumes inflows arrive evenly through the year.
- Discounted payback period
- Same as payback, but use PV of inflow = Cash inflow × PV factor at cost of capital
- Cumulate present values, not raw cash flows.
- Payback reciprocal
- Payback reciprocal = (Average annual cash inflow ÷ Initial investment) × 100 = (1 ÷ Payback period) × 100
- Good approximation of IRR only if life is at least twice the payback and inflows are even.
- Decision rule
- Accept if payback ≤ maximum acceptable period; among alternatives choose the shortest
- The cut-off is set by management, not by a formula.
- ARR on average investment
- ARR = Average annual profit after depreciation (and tax) ÷ Average investment × 100
- Use this when the question asks for average investment. If the question does not name the base, state which base you have used.
- ARR on initial investment
- ARR = Average annual profit after depreciation (and tax) ÷ Initial investment × 100
- Use when the question asks for it or defines ARR this way.
- Average annual profit
- Average profit = Σ (annual profits after depreciation and tax) ÷ Number of years
- If profits are given before depreciation, deduct depreciation first.
- Average investment (with salvage)
- Average investment = (Initial investment + Salvage value) ÷ 2
- Valid for straight-line depreciation when there is no working capital.
- Average investment (with working capital)
- Average investment = (Cost + Salvage value) ÷ 2 + Working capital
- Working capital stays tied up throughout the project, so it is added in full and not halved.
- Decision rule
- Accept if ARR ≥ target rate; for ranking, choose the highest ARR
- Mutually exclusive projects: pick the higher ARR if it is above the cut-off.
- Present value of a single cash flow
- PV = Cash flow in year n ÷ (1 + r)^n
- r is the discount rate. In exams you usually multiply by the PV factor given in the question instead.
- Net Present Value
- NPV = Σ [Ct ÷ (1 + r)^t] − C0
- Ct is the net cash inflow in year t. C0 is the initial outflow. Include working capital and salvage value in the right years.
- NPV with annuity
- NPV = (Annual cash inflow × Annuity PV factor) − Initial outflow
- Use only when inflows are equal each year.
- Profitability Index
- PI = PV of cash inflows ÷ PV of cash outflows
- If outflows occur only at time 0, the denominator is the initial investment.
- Relationship between NPV and PI
- PI = 1 + (NPV ÷ PV of outflows)
- Holds when outflows are all at time 0. NPV > 0 means PI > 1.
- Decision rule for a single project
- Accept if NPV > 0 (PI > 1); reject if NPV < 0 (PI < 1)
- At NPV = 0 (PI = 1) the project earns exactly the required rate, so you are indifferent.
- Decision rule for mutually exclusive projects
- Choose the project with the highest positive NPV
- Compare projects on the same discount rate and the same time basis.
- IRR definition
- Σ [CFt ÷ (1 + r)^t] − Initial outflow = 0
- The r that satisfies this is the IRR. t runs from 1 to n.
- Interpolation formula
- IRR = L + [NPV at L ÷ (NPV at L − NPV at H)] × (H − L)
- L is the lower rate (positive NPV) and H is the higher rate (negative NPV). Keep the gap between L and H small, ideally 1% to 5%.
- Equal annual inflows: first guess
- Factor = Initial outlay ÷ Annual cash inflow
- Look up this factor in the annuity table on the row for n years. The column closest to it gives your first trial rate.
- Uneven inflows: rough first guess (heuristic only)
- Factor = Initial outlay ÷ Average annual inflow
- This is only a rough heuristic, not a dependable method. It ignores the timing of the inflows and can be well off when they are very uneven. Use the nearest annuity factor only to pick a first trial rate, then check the NPV and adjust.
- MIRR
- MIRR = (Terminal value of inflows ÷ PV of outflows)^(1/n) − 1
- Terminal value is each inflow compounded to the end of year n at the reinvestment rate. Outflows are discounted to year 0 at the finance rate (usually the cost of capital).
- IRR decision rule
- Accept if IRR > cost of capital; reject if IRR < cost of capital
- At IRR equal to cost of capital, the project is at break-even. For mutually exclusive projects, prefer NPV if the two methods conflict.
- Profitability Index
- PI = PV of cash inflows ÷ PV of cash outflows = 1 + (NPV ÷ initial outlay)
- Use this to rank divisible projects under a single-period budget. Where the outlay is all at time 0, both forms give the same value.
- Capital rationing rule (divisible)
- Rank by PI (highest first). Fund in order until the budget ends. Take the last project in proportion.
- Partial NPV = (funds used ÷ full outlay) × NPV of that project.
- Capital rationing rule (indivisible)
- Choose the feasible combination with the highest total NPV, with total outlay ≤ budget
- A combination that uses the whole budget is not always the best. Compare NPVs, not PIs.
- Present value annuity factor
- PVAF(r, n) = [1 − (1 + r)^−n] ÷ r
- Usually given in the PV annuity table. Use the factor for the project's own life.
- Equivalent Annual Annuity
- EAA = NPV ÷ PVAF(r, n)
- Use for mutually exclusive projects of unequal lives. Higher EAA is better.
- Equivalent Annual Cost
- EAC = PV of total costs ÷ PVAF(r, n)
- Use when projects have only costs, such as choosing between two machines. Lower EAC is better.
- Risk-adjusted discount rate
- RADR = Risk-free rate + Risk premium
- Discount the normal (uncertain) cash flows at RADR. Higher risk means a higher premium.
- Certainty equivalent coefficient
- α = Certain cash flow ÷ Risky (expected) cash flow
- α lies between 0 and 1. Lower α means the management is more risk averse for that year.
- NPV by certainty equivalent
- NPV = Σ [α(t) × CFt ÷ (1 + Rf)^t] − Initial outlay
- Discount at the risk-free rate Rf, not at the cost of capital.
- Expected NPV
- E(NPV) = Σ [p × NPV]
- Probabilities must add up to 1.
- Standard deviation of NPV
- σ = √ Σ [p × (NPV − E(NPV))²]
- Measures total spread of outcomes around the expected NPV.
- Coefficient of variation
- CV = σ ÷ E(NPV)
- Risk per rupee of expected return. Lower CV is better when comparing projects.
- SD of project NPV, independent cash flows
- σNPV = √ Σ [σt² ÷ (1 + i)^(2t)]
- Use when cash flows of different years are independent. i is the risk-free rate.
- SD of project NPV, perfectly correlated cash flows
- σNPV = Σ [σt ÷ (1 + i)^t]
- Use when cash flows in each year move together perfectly.
- Decision tree rollback
- Value at a chance node = Σ (probability × value of branch); at a decision node = best branch
- Start at the right-hand end and move left.
Quick revision
- Use incremental, after-tax cash flows, not accounting profit, for NPV, IRR and payback.
- Ignore sunk costs. Include opportunity costs and working capital changes.
- Depreciation is non-cash. It matters only through its tax shield: depreciation × tax rate.
- Payback = years to recover the initial outlay. Accept if it is within the cut-off. It ignores cash flows after payback.
- Discounted payback uses present values of cash flows, so it is never shorter than simple payback. It may not exist if the discounted flows never recover the outlay.
- ARR = average accounting profit ÷ average (or initial) investment. State which base you used.
- NPV = Σ present value of inflows − initial outlay. Accept if NPV > 0.
- PI = present value of inflows ÷ initial outlay. Accept if PI > 1.
- IRR is the rate at which NPV = 0. Accept if IRR exceeds the cost of capital.
- MIRR compounds inflows to the end at the reinvestment rate, then finds the rate that equates this to the outlay.
- For mutually exclusive projects with conflicting ranks, NPV is the preferred method.
- With capital rationing, rank by PI for divisible projects and pick the combination with the highest total NPV for indivisible ones.
- For unequal lives, compare using equivalent annual NPV or cost, or a common life.
Common mistakes
- Confusing capital budgeting with working capital management. Fix: Capital budgeting deals with long-term assets and multi-year benefits. Working capital deals with short-term assets and liabilities.
- Listing the steps of the process in the wrong order. Fix: Learn the sequence: identification, screening, evaluation, selection and approval, implementation, performance review. Write them in that order.
- Including sunk costs such as a market survey already paid for. Fix: Ask: does this cash change if I accept or reject? If not, leave it out.
- Deducting depreciation as a cash outflow, or forgetting to add it back. Fix: Deduct it only to compute tax, then add it back. Or use the shortcut CFAT = (S − C)(1 − t) + Dep × t.
- Using accounting profit instead of cash inflow Fix: Add back depreciation and other non-cash charges to get cash inflow before using it.
- Interpolating with the wrong year's cash flow Fix: Divide the unrecovered balance by the inflow of the year in which recovery happens.
- Using profit before depreciation. Fix: ARR uses accounting profit. Always deduct depreciation, and tax if given, before averaging.
- Using initial investment when the question wants average investment. Fix: Underline the base the question names. If it is not named, show average investment and state that you have used it.
- Including interest on borrowed funds in the cash flows Fix: Leave financing costs out. The discount rate already reflects the cost of funds.
- Forgetting to add back depreciation Fix: Depreciation is non-cash. Cash flow after tax = PAT + depreciation, but still deduct the tax effect correctly.
Exam tips
- Theory questions on this topic are often short notes or 5-mark explanations. Prepare a ready list of features, importance, steps and difficulties.
- Write the steps in order and name each one. Examiners check the sequence.
- Learn the three project types (independent, mutually exclusive, contingent) with one example each, because MCQs often test them.
- Link your answer to wealth maximisation to show you understand why the topic matters.
- Revise this topic before the numerical topics (NPV, IRR, payback), since it gives you the language for interpretation.
- Always write a working note for depreciation and tax. Step marks are given even if the final figure is wrong.
- Read the question for words like already spent, allocated, or interest. These usually signal items to exclude.
- Check for working capital and salvage value in the last line of the question. They are easy to miss.