Skip to content

CFA Level II · CFA Level II Exam

Valuation of Contingent Claims: formula sheet

Opens the print dialog. Choose "Save as PDF".
Full chapter guideFlashcards for this chapter

Key formulas

Up and down factors
u = S(up) ÷ S0; d = S(down) ÷ S0; often d = 1 ÷ u
The exam usually gives u and d, or gives the prices directly. When built from volatility, u = e^(σ√Δt).
Risk-neutral probability of an up move
π = (1 + r − d) ÷ (u − d)
Here r is the risk-free rate per period. Probability of a down move = 1 − π. For a stock paying a dividend yield or an asset with carry, adjust the numerator for the benefit or cost, as the question specifies.
Option value, one period
V0 = [π × V(up) + (1 − π) × V(down)] ÷ (1 + r)
Use at every node when working backward in a multi-period tree.
Hedge ratio (delta)
h = [V(up) − V(down)] ÷ [S(up) − S(down)]
h is the number of shares in the portfolio that replicates one option. A call has 0 < h < 1 and a put has −1 < h < 0, so replicating a put means shorting shares. To hedge a long put, buy |h| shares. To hedge a short call, buy h shares.
Replication value of a call
c0 = h × S0 − PV of borrowing, where borrowing = [h × S(down) − c(down)] ÷ (1 + r)
The replicating portfolio holds h shares and borrows the amount needed to match payoffs in both states.
Terminal payoffs
Call = max(0, S − K); Put = max(0, K − S)
Compute these at every final node first.
American option value at a node
V = max(exercise value, continuation value)
Exercise value is the immediate payoff. Continuation value is the discounted risk-neutral expectation. European options use continuation value only.
Adjacent rates in the tree
Upper rate = Lower rate × e^(2σ)
Applies to two adjacent nodes at the same date. σ is the annual volatility assumption, and each period is treated as one year here.
Backward induction at a node
V = 0.5 × [(V_up + C) ÷ (1 + i)] + 0.5 × [(V_down + C) ÷ (1 + i)]
V_up and V_down are next-period node values, C is the coupon paid at the next date, and i is the one-period rate at the node you are valuing. Use the rate at this node, not at the next ones.
Callable bond node value
Node value = min(calculated value, call price)
Apply on each call date at each node, using the value before adding that date's coupon. The issuer calls when the calculated value is above the call price.
Putable bond node value
Node value = max(calculated value, put price)
Apply on each put date at each node. The holder puts when the calculated value is below the put price.
Embedded option values
Call value = Straight − Callable; Put value = Putable − Straight
Compute both bonds on the same tree. Mixing trees or rates gives the wrong option value.
Caplet and floorlet payoffs
Caplet = notional × max(0, i − strike); Floorlet = notional × max(0, strike − i)
The rate i is the reset-date rate. Payment is made one period later, so discount the payoff by (1 + i) at that node. Cap value = sum of caplets. Floor value = sum of floorlets.
d1
d1 = [ln(S₀ ÷ X) + (r − δ + σ² ÷ 2) × T] ÷ (σ × √T)
r is the continuously compounded risk-free rate, δ the continuous dividend yield (0 if none), σ the annual volatility, T in years.
d2
d2 = d1 − σ × √T
Always subtract σ√T from d1, not from the numerator.
European call
c = S₀ × e^(−δT) × N(d1) − X × e^(−rT) × N(d2)
With no dividends, e^(−δT) = 1.
European put
p = X × e^(−rT) × N(−d2) − S₀ × e^(−δT) × N(−d1)
Use N(−d) = 1 − N(d).
Put-call parity check
c − p = S₀ × e^(−δT) − X × e^(−rT)
A quick way to verify your call and put values.
Option deltas
Call delta = e^(−δT) × N(d1); Put delta = e^(−δT) × [N(d1) − 1]
Call delta lies between 0 and 1; put delta between −1 and 0.
Black call on a futures or forward price
c = e^(-rT) × [F0 × N(d1) − X × N(d2)]
F0 is the futures or forward price for delivery at the underlying's date. T is time to option expiry. r is the continuously compounded risk-free rate.
Black put on a futures or forward price
p = e^(-rT) × [X × N(−d2) − F0 × N(−d1)]
Put-call parity for futures options: c − p = e^(-rT) × (F0 − X).
d1 and d2
d1 = [ln(F0 ÷ X) + (σ² ÷ 2) × T] ÷ (σ × √T); d2 = d1 − σ × √T
σ is the volatility of the futures or forward price. There is no r or carry term inside d1.
Caplet value
Caplet = AD × NP × (days ÷ 360) × [FRA × N(d1) − X × N(d2)]
AD is the discount factor to the payment date (end of the period). FRA is the forward rate for the period that starts at option expiry. In d1 and d2 use t = time to option expiry.
Floorlet value
Floorlet = AD × NP × (days ÷ 360) × [X × N(−d2) − FRA × N(−d1)]
Same inputs as the caplet. A cap is the sum of its caplets and a floor is the sum of its floorlets.
Payer swaption
Payer = PVA × NP × [FSR × N(d1) − X × N(d2)]
FSR is the forward swap rate at option expiry. PVA is the present value annuity factor: the sum of discount factors times period fractions over the swap's payment dates. Use time to option expiry in d1 and d2.
Receiver swaption
Receiver = PVA × NP × [X × N(−d2) − FSR × N(−d1)]
A put on the forward swap rate. Payer − receiver for the same strike equals the PV of a forward swap paying fixed X against floating.
Interest rate option d1 and d2
d1 = [ln(F ÷ X) + (σ² ÷ 2) × t] ÷ (σ × √t); d2 = d1 − σ × √t
F is the FRA rate or forward swap rate. σ is the volatility of that rate.
Delta
Delta = Δ option price ÷ Δ underlying price
Call: 0 to 1. Put: -1 to 0. For a European option on a non-dividend asset, put delta = call delta - 1.
Delta approximation of price change
ΔOption ≈ Delta × ΔS
Accurate only for small moves in the underlying.
Delta-gamma approximation
ΔOption ≈ Delta × ΔS + ½ × Gamma × (ΔS)²
The gamma term is always positive for a long option, whichever way S moves.
New delta after a move
New delta ≈ Old delta + Gamma × ΔS
Use this to find how many shares to trade when you rebalance.
Delta hedge of an option position
Shares to hold = -(Number of options × Delta × Contract size)
Long calls need short shares. Short calls need long shares. Long puts need long shares.
Hedging a stock position with options
Options to trade = -(Number of shares ÷ Option delta ÷ Contract size)
To hedge long shares with calls, sell calls. Divide by delta, not multiply.
Gamma hedge
Hedge options = -(Portfolio gamma ÷ Gamma of hedge option)
Positive result means buy. After this, portfolio delta changes, so reset delta using the underlying.
Greek signs for long positions
Theta usually < 0; Vega > 0; Call rho > 0; Put rho < 0
Deep in-the-money European puts can have positive theta. Treat the signs as typical, not universal.
Implied volatility definition
Find σ such that BSM(S, X, T, r, σ) = observed market price
Solved by iteration. For European options under BSM, value increases with σ (vega > 0), so the solution is unique for a given price within no-arbitrage bounds.
Direction of adjustment
Model price < market price → increase σ; model price > market price → decrease σ
Works for European calls and puts under BSM because vega > 0.
Volatility smile / skew
Implied σ plotted against strike (or moneyness X ÷ S) for one maturity
Under BSM assumptions this would be flat. A non-flat shape signals departures from BSM.
Term structure of implied volatility
Implied σ plotted against time to expiration for the same strike or moneyness
Upward-sloping, flat or downward-sloping. Short-dated volatility often exceeds long-dated after market stress.
Volatility surface
Implied σ as a function of strike and maturity
Used to price options with strikes and maturities not directly quoted, by interpolation.
Linear interpolation on the surface
σ at K = σ1 + (K − K1) ÷ (K2 − K1) × (σ2 − σ1)
A simple way to estimate implied volatility between two quoted strikes.
Put-call parity (no income on underlying)
c + X ÷ (1+r)^T = p + S0
European options, same strike and expiry. Left side is the fiduciary call. Right side is the protective put.
Put-call parity with income or costs
c + X ÷ (1+r)^T = p + S0 − PV(income) + PV(storage costs)
Income such as dividends or coupons is deducted from S0. Discount income and costs at the risk-free rate to option expiry.
Put-call forward parity
c + X ÷ (1+r)^T = p + F0(T) ÷ (1+r)^T, so c − p = [F0(T) − X] ÷ (1+r)^T
F0(T) is the forward price for delivery at option expiry. This form handles income automatically because the income is in F0.
Options on futures
c + X ÷ (1+r)^T = p + f0(T) ÷ (1+r)^T
Use the futures price f0(T) in the same form. Valid when the futures option expires with the futures contract.
Synthetic positions
c = p + S0 − X ÷ (1+r)^T; p = c − S0 + X ÷ (1+r)^T; S0 = c − p + X ÷ (1+r)^T; bond = p + S0 − c
Signs show long or short. A negative term means a short position, or borrowing for the bond.
Options on bonds
c + X ÷ (1+r)^T = p + B0 − PV(coupons)
B0 is the full (dirty) bond price, and PV(coupons) is computed to the option expiry date. Alternatively, use the forward price of the bond in forward parity.
Payer swaption payoff at expiry
Value at expiry = Notional × Max[0, S − X] × PV annuity, where PV annuity = Σ(period fraction × discount factor) over the swap payment dates
S is the market swap fixed rate at expiry. X is the exercise rate. The discount factors in the PV annuity already do the discounting, so do not discount the payoff again.
Receiver swaption payoff at expiry
Value at expiry = Notional × Max[0, X − S] × PV annuity, where PV annuity = Σ(period fraction × discount factor) over the swap payment dates
Receiver gains when market swap rate falls below exercise rate. The PV annuity turns the per-period rate gap into a value at expiry, as in the payer formula.
Black payer swaption value
Payer = PVA × [F × N(d1) − X × N(d2)]
PVA is the PV of the annuity of the swap payments (sum of period fraction × discount factors × notional). F is the forward swap rate at option expiry.
Black receiver swaption value
Receiver = PVA × [X × N(−d2) − F × N(−d1)]
N(−d) = 1 − N(d).
Black d1 and d2
d1 = [ln(F ÷ X) + (σ² ÷ 2) × T] ÷ (σ × √T); d2 = d1 − σ × √T
T is time to option expiry in years, not the swap tenor.
Swaption put-call parity
Payer − Receiver = PVA × (F − X)
Equals the value of a forward swap paying fixed X. Long payer plus short receiver equals paying fixed at X.
Cap and floor as a swap
Long cap + Short floor (same strike and dates) = pay-fixed swap at the strike
The swap's fixed rate is the strike rate.
Caplet payoff (paid in arrears)
Notional × Max[0, (Reference rate − Strike)] × (days/360), paid at the end of the period
The rate is set at the start of the period. The payment is made at the end.

Quick revision

  • Binomial: u and d give up and down values; risk-neutral probability π = (1 + r − d) ÷ (u − d), with r as the per-period rate.
  • Option value today = [π × up payoff + (1 − π) × down payoff] ÷ (1 + r), working backward from the end.
  • American options need an early-exercise check at each node of the tree.
  • Put-call parity (no dividends): c + X ÷ (1 + r)^T = p + S.
  • BSM assumes constant volatility, lognormal prices and a constant risk-free rate; call and put use N(d1) and N(d2).
  • Call delta is between 0 and 1; put delta is between −1 and 0.
  • Gamma is highest for at-the-money options and is the same for a call and put with the same terms.
  • Vega is positive for long calls and puts; theta is usually negative for long options.
  • Delta-gamma hedging reduces risk from larger price moves than delta alone.
  • Implied volatility is the volatility that makes the model price equal the market price.
  • A volatility smile shows that the constant-volatility BSM assumption does not hold in the market.
  • Black model uses the futures or forward price as the underlying input; a swaption is an option on a swap, valued with the Black model using the forward swap rate.

Common mistakes

  • Using the real-world probability of an up move instead of π. Fix: Option values use only the risk-neutral π = (1 + r − d) ÷ (u − d). Real-world probabilities are a distractor.
  • Forgetting to compare with exercise value for an American option. Fix: At each node before expiry, write both numbers (exercise and continuation) and take the larger. Then use that larger number in the next step back.
  • Discounting at the wrong rate. Fix: Each node's value is discounted at the rate shown at that node. Label rates on your drawing before you start.
  • Forgetting the coupon in backward induction. Fix: Add the coupon to each next value inside the brackets, then average and discount. Keep the node value itself ex-coupon.
  • Using the stock's expected return instead of the risk-free rate in d1. Fix: The BSM model uses only r. Expected return is irrelevant because the option is priced by replication.
  • Computing d2 as d1 − σ² × T or d1 − σ instead of d1 − σ√T. Fix: Compute σ√T once, use it as the denominator of d1, and subtract that same number to get d2.
  • Using a spot price or adding a carry term in the Black model. Fix: In Black, F0 is the input and nothing else adds a carry or dividend term. Discount only by e^(-rT).
  • Using time to payment instead of time to expiry inside d1 and d2 for caplets and floorlets. Fix: Volatility accrues until the option expires. Use that t in d1 and d2. Use the payment date only for the discount factor AD.
  • Multiplying instead of dividing when hedging shares with options. Fix: Ask which side you hold. Hedging options with shares: multiply by delta. Hedging shares with options: divide by delta.
  • Using a positive delta for a put. Fix: Put delta is negative. Check with put delta = call delta - 1 for a non-dividend European option.

Exam tips

  • Every tree question sits inside a vignette. Underline u, d, r per period, K and the exercise style before you calculate anything.
  • Ignore real-world up and down probabilities if they are given. Only π enters the option value.
  • For American puts, test the down nodes first. That is where early exercise is most likely, and where the answer usually differs from the European value.
  • Know the qualitative points too: an American option is worth at least as much as the European option with the same terms, and an American call on a non-dividend-paying stock has the same value as the European call.
  • Use the hedge ratio and replication logic for questions about arbitrage or how to hedge. Both give the same value as the risk-neutral method, so use one as a check if time allows.
  • Look for which rate the question gives at each node. The data is often in an exhibit, and the text may only give the strike or call price.
  • Check the order of the coupon and the call test. Read the vignette for whether the call is immediately after or before the coupon date.
  • For caps and floors, always check the payment date. Payment one period after reset means one discount at the reset-node rate.