Risk Management Strategies: formula sheet

Full chapter guide

Key formulas

Risk score
Risk score = Likelihood score × Impact score
Use the scale given in the question (for example 1 to 5). If no scale is given, state your own and keep it consistent.
Expected loss
Expected loss = Probability of event × Loss if it occurs
Use only when the question gives a probability and a rupee loss. It is not the same as a matrix score.
Process sequence
Identify → Assess → Prioritise → Treat → Monitor and review
Monitoring and review feed back into identification, so the process is a cycle and not a one-time exercise.
Treatment options
Avoid | Reduce | Transfer | Accept
Match the option to the risk: avoid very high risks you can do without, transfer high-impact rare risks, reduce frequent ones, accept minor ones.
Risk exposure (simple rating)
Risk exposure = Probability of event × Impact (₹)
Used to rank risks before choosing a response. Expected loss is only a guide, not a guarantee.
Residual risk
Residual risk = Inherent risk − Effect of risk responses
A conceptual relation, not an exact arithmetic one. Even after a response, some risk stays.
Cost-benefit test for a response
Adopt the response if reduction in expected loss > cost of the response
Use for reduction and transfer. If the cost is higher than the benefit, acceptance may be better.
Response matching rule
High impact, high likelihood → avoid or reduce strongly (depending on cost-benefit and whether the opportunity is worth the risk); high impact, low likelihood → transfer or share; low impact, high likelihood → reduce; low impact, low likelihood → accept
A rule of thumb for answers, not a law. For the high-high case, avoid only if the loss outweighs the benefit of the activity; otherwise reduce strongly. State your reasoning with the facts given.
Net retained loss under insurance
Retained loss = Actual loss − Insurance recovery + Premium paid
Include the premium as a cost. Recovery is limited by the sum insured, deductible and policy terms.
Insurance recovery with deductible and cap
Recovery = Minimum of (Loss − Deductible, Sum insured)
Use when the loss is above the deductible. If loss is below the deductible, recovery is nil.
Forward hedge outcome for an importer
Rupee cost = Foreign currency payable × Forward rate
The cost is fixed at the forward rate, whatever the spot rate on the payment date.
Gain or loss versus staying unhedged
Hedge benefit = Foreign currency amount × (Spot at settlement − Forward rate)
For a payable: positive means hedging saved money. For a receivable, reverse the sign.
Principle of indemnity
Claim ≤ Actual loss
Insurance indemnifies the loss. You cannot profit from a claim, subject to the sum insured.
Risk rating (score)
Risk score = Likelihood × Impact
Use the same scale for all risks (for example 1 to 5 each, giving a score up to 25). Scales are a choice of the venture, not a fixed standard.
Expected loss
Expected loss = Probability of event × Loss if it occurs
Useful to rank risks in rupees. It ignores very rare but severe events, so judge those separately.
Residual risk
Residual risk = Inherent risk − Effect of controls and responses
This is a concept, not exact arithmetic. Inherent risk is before controls; residual is what remains.
Appetite versus tolerance
Risk appetite = broad level of risk accepted; Risk tolerance = measurable limit for an objective
Tolerance must sit inside appetite and be expressed in numbers where possible.
COSO ERM components
Governance and culture; Strategy and objective-setting; Performance; Review and revision; Information, communication and reporting
Learn these five in order. They are the base for framework questions.
Contingency plan structure
Trigger event → Trigger point → Action → Owner → Resources → Time limit
Use this to write any fallback plan in an answer. A trigger point is the signal that activates the plan.
Recovery Time Objective (RTO)
RTO = maximum acceptable time a function can stay down
Set per function. Critical functions get shorter RTOs.
Recovery Point Objective (RPO)
RPO = maximum acceptable data loss, measured in time since the last backup
If RPO is 4 hours, backups must be taken at least every 4 hours.
Cash runway (continuity check)
Runway (months) = Available cash ÷ Monthly net cash burn
Shows how long the startup can survive a disruption with no revenue recovery.

Quick revision

  • Risk is uncertainty that can affect a startup's objectives, and it can hurt or help.
  • Common startup risk types: market, financial, operational, technology, legal and compliance, people, and reputation.
  • Process: identify, assess, respond, monitor and review.
  • Assess risk using likelihood and impact, and rank the risks.
  • The four basic responses are avoid, reduce, transfer and accept.
  • Accept a risk only when it is small or the cost of treating it is higher than the benefit.
  • Insurance transfers financial loss for a premium but does not remove the risk itself.
  • Contracts can shift risk through clauses such as indemnity, limits of liability and warranties.
  • A framework assigns ownership, reporting lines and review of risks.
  • Risk culture starts with founders who discuss risks openly and reward early reporting.
  • A contingency plan covers specific events; a continuity plan keeps critical functions running.
  • Always end a case answer with a clear, reasoned recommendation.

Common mistakes

  • Treating risk and failure as the same thing. Fix: Define risk as uncertainty of outcomes. Failure is one possible result, and gain is the other.
  • Labelling every cash problem as financial risk. Fix: Ask why cash fell. Poor sales is market risk. A late supplier is operational. Heavy debt is financial.
  • Listing risks and stopping there Fix: Cover all stages. Even a line each for assessment, treatment and monitoring earns marks.
  • Giving generic risks that ignore the case Fix: Quote case facts, such as a single supplier or a short cash runway, and build each risk from them.
  • Treating transfer and sharing as the same thing. Fix: Ask whether the partner also shares the reward and stays involved. If yes, it is sharing. If you only pay a fee to move the loss, it is transfer.
  • Calling insurance a complete removal of risk. Fix: Say insurance transfers the financial loss. Reputation, delay and uninsured items remain as residual risk.
  • Saying transfer removes the risk. Fix: Write that only the financial consequence moves. The event can still occur and some loss is retained.
  • Treating key man insurance as cover for the employee's family. Fix: Remember the company is the policyholder and beneficiary, and it needs an insurable interest in the key person.
  • Treating risk appetite and risk tolerance as the same thing. Fix: Say appetite is the broad level of risk the venture will take for its goals, and tolerance is the specific limit on an objective, such as minimum cash runway.
  • Describing risk management as the job of one risk officer only. Fix: Show that every risk owner manages risk in their area, and the coordinator only supports and reports. Culture needs everyone.

Exam tips

  • In case scenarios, quote the exact fact that shows the risk, then name the type.
  • Learn the six types in a fixed order so a classification answer is complete under time pressure.
  • Always give a startup example. Generic definitions earn fewer marks than applied answers.
  • For MCQs, pick the root cause when two types seem to fit.
  • Prepare the business risk versus financial risk contrast. It is a likely short-note or distinction question.
  • Tie every point to a fact in the case scenario. Generic answers score poorly in application questions.
  • Use a small matrix or a list of scores to show the working. Examiners reward visible logic.
  • In MCQs, watch for the order of stages and for the difference between avoid, reduce, transfer and accept.