Expected loss
EL = PD × LGD × EAD
PD is probability of default, LGD is loss given default, EAD is exposure at default. Treat it as an introduction here; the detailed measurement is a separate topic.
Loss given default
LGD = 1 − Recovery rate
Both are expressed as a proportion of exposure at default.
Concentration share
Concentration (%) = Exposure to one borrower, group or sector ÷ Total exposure × 100
Use it to spot concentration. Compare the result against the bank's internal limits and regulatory exposure norms.
Expected loss
EL = PD × LGD × EAD
Used to price loans and set provisions; PD is probability of default, LGD is loss given default, EAD is exposure at default.
Exposure limit (percentage of capital)
Maximum exposure = Limit % × Capital base
Use the capital base specified by the regulator or bank policy for the limit in the question; do not assume the percentage unless given.
Headroom under a limit
Headroom = Limit − Existing exposure
A new proposal is within limit only if proposed exposure ≤ headroom.
Portfolio share of a sector
Sector share = Sector exposure ÷ Total portfolio × 100
Compare with the internal sector cap to test concentration.
Altman Z-score (original, listed manufacturing companies)
Z = 1.2×X1 + 1.4×X2 + 3.3×X3 + 0.6×X4 + 1.0×X5
X1 = working capital ÷ total assets; X2 = retained earnings ÷ total assets; X3 = EBIT ÷ total assets; X4 = market value of equity ÷ book value of total liabilities; X5 = sales ÷ total assets.
Altman Z-score zones (original model)
Z > 2.99 safe; 1.81 to 2.99 grey; Z < 1.81 distress
Cut-offs differ for the Z′ (private firms) and Z″ (non-manufacturers) versions. Say which model you use.
Transition matrix property
Σ of probabilities in each row = 100%
Row = current grade; column = grade at end of period. Default is usually an absorbing state.
Probability of default from a matrix
PD (1 year) = value in the row of the current grade, column 'Default'
For two years, multiply the matrix by itself, assuming migrations are independent across years.
Expected loss
EL = PD × LGD × EAD
Links the rating (which gives PD) to the loss estimate.
Debt service coverage ratio
DSCR = (PAT + depreciation + interest on term loan) ÷ (interest + instalment of term loan)
Common capacity test. Banks usually look for a figure comfortably above 1.
Expected loss
EL = PD × LGD × EAD
Use PD and LGD as decimals. EL is in rupees. All three must refer to the same horizon.
Loss given default
LGD = 1 − Recovery rate
Recovery rate is net of workout costs if the question says so.
Exposure at default
EAD = Drawn amount + CCF × Undrawn commitment
CCF is the credit conversion factor, given in the question.
Portfolio expected loss
EL(portfolio) = Σ EL of each exposure
Expected losses add up simply, whatever the correlation.
Unexpected loss, single exposure with fixed LGD and EAD
UL = EAD × LGD × √[PD × (1 − PD)]
Assumes LGD is certain and default is a yes/no event. Sound only under this simplification.
Credit VaR
Credit VaR = Loss at chosen confidence level − EL
Some texts define credit VaR as the loss quantile itself. Follow the definition in the question.
Net loss rate or EL rate
EL rate = EL ÷ EAD = PD × LGD
Useful to compare pricing across loans.
Risk-weighted asset (funded exposure)
RWA = Exposure (net of eligible provisions/collateral, where allowed) × Risk weight
Use the exposure value the question gives. Apply the risk weight as a percentage.
Off-balance sheet exposure
Credit equivalent = Notional amount × Credit conversion factor (CCF); RWA = Credit equivalent × Risk weight
Convert first, then apply the counterparty's risk weight.
Capital adequacy ratio (CRAR)
CRAR = Eligible capital ÷ Total RWA × 100
Total RWA should include credit, market and operational risk RWA when given.
Tier 1 ratio
Tier 1 ratio = Tier 1 capital ÷ Total RWA × 100
Tier 1 = Common Equity Tier 1 + Additional Tier 1.
Minimum capital required
Required capital = Total RWA × Minimum CRAR %
Compare with actual capital to find surplus or shortfall.
Capital for operational/market risk to RWA
RWA equivalent = Capital charge × (100 ÷ Minimum CRAR %)
Use the minimum ratio the question states, for example ×11.11 at 9%.
IRB inputs
Expected loss = PD × LGD × EAD
IRB risk weights are driven by PD, LGD and EAD (and maturity). Foundation: own PD. Advanced: own PD, LGD, EAD.
Net exposure after collateral (comprehensive approach)
E* = max{0, E × (1 + He) − C × (1 − Hc − Hfx)}
E = exposure, He = haircut on exposure, C = collateral value, Hc = haircut on collateral, Hfx = currency mismatch haircut. Capital is then computed on E*.
Simple netting of loans and deposits
Net exposure = Loan outstanding − Eligible deposit set off
Applies only when there is a legally enforceable netting right. Floor at zero.
Guarantee substitution
Covered portion takes the guarantor's risk weight; uncovered portion keeps the borrower's risk weight
Applies for eligible guarantees. Risk-weighted assets = covered × guarantor RW + uncovered × borrower RW.
Risk-weighted assets and capital
RWA = Exposure × Risk weight; Capital required = RWA × minimum capital ratio
Use the ratio given in the question. Do not assume a figure.
Credit default swap payout
Payout = Notional × (1 − Recovery rate)
Applies on a credit event under cash settlement. Annual premium = Spread × Notional.
Expected loss
EL = PD × LGD × EAD
Collateral and guarantees reduce LGD or EAD, and so reduce EL.
NPA test (term loans)
Overdue > 90 days → NPA
Interest or principal overdue for more than 90 days. Standard assets are not overdue beyond this.
Sub-standard asset
NPA for ≤ 12 months
Secured sub-standard asset: provision 15% of outstanding. If the exposure is unsecured, the rate is 25% (15% + 10% additional). An exposure is unsecured where the realisable value of the security, as assessed by the bank, approved valuers or RBI's inspecting officers, is not more than 10% ab initio (from the start) of the outstanding.
Doubtful asset
Sub-standard for 12 months
Secured portion: 25% (up to 1 year), 40% (1-3 years), 100% (over 3 years). Unsecured portion: 100%.
Loss asset
Provision = 100% of outstanding
Applies to the amount not written off.
Unsecured sub-standard exposure
Provision = 25% of outstanding
Where the realisable value of security is not more than 10% ab initio of the outstanding (as assessed by the bank, approved valuers or RBI), the sub-standard rate is 25%, not 15%.
Doubtful provision
Provision = 100% × unsecured portion + rate × secured portion
Unsecured portion = outstanding − realisable value of security.
Net NPA
Net NPA = Gross NPA − provisions held
Net NPA ratio = Net NPA ÷ Net advances.
Gross NPA ratio
Gross NPA ÷ Gross advances × 100
Key measure of asset quality.
Provision Coverage Ratio
PCR = Provisions held against NPAs ÷ Gross NPA × 100
Shows how much of NPAs is already covered.
Standard asset provision
Provision = standard asset rate for the sector × outstanding
Standard asset provision rates vary by sector: 0.25% for direct advances to agriculture and SMEs, 0.40% for other (general) standard advances, 0.75% for commercial real estate - residential housing (CRE-RH), and 1% for commercial real estate (CRE). Use the rate given in the question.

Quick revision

  • Credit risk is the risk of loss when a borrower or counterparty fails to meet its obligation on time.
  • Components include default risk, exposure risk, recovery risk, concentration risk and counterparty risk.
  • Expected loss = PD × LGD × EAD.
  • PD is the likelihood of default over a stated period, usually one year.
  • LGD is the share of exposure lost after recoveries; recovery rate = 1 − LGD.
  • EAD is the amount outstanding at the time of default, including expected drawdown of undrawn limits.
  • Expected loss is covered by pricing and provisions; unexpected loss is covered by capital.
  • Risk-weighted assets = exposure × risk weight; capital ratio = capital ÷ RWA.
  • Collateral, guarantees and netting reduce exposure; credit derivatives and securitisation transfer risk.
  • A credit policy sets limits, delegation of powers, pricing and monitoring rules.
  • Credit rating gives an opinion on the likelihood of timely repayment.
  • Asset classification moves a loan from standard to NPA stages based on overdue period; provisions rise as the asset worsens.

Common mistakes

  • Treating credit risk and counterparty risk as the same thing. Fix: Counterparty risk is a subset tied to trades and contracts where the exposure value changes before settlement. Default risk on a loan is about the borrower repaying principal and interest.
  • Calling concentration risk a type of default. Fix: Concentration is about portfolio structure. Each borrower may be sound, yet the bunching makes the portfolio vulnerable to one shock.
  • Saying management approves the credit policy. Fix: Write that the board approves the policy; management implements it through procedures.
  • Letting the business team rate and sanction its own loans. Fix: Stress separation of the credit risk function from the business lines and the use of committee approval for larger loans.
  • Treating internal and external ratings as the same thing Fix: State who assigns it: the bank (internal, for its own decisions, pricing and IRB capital) versus a SEBI-registered agency (external, public, used for standardised risk weights).
  • Listing the 5 Cs without applying them to the case Fix: Attach a fact and a verdict to each C, then conclude.
  • Using the sanctioned limit as EAD instead of drawn amount plus CCF × undrawn. Fix: Always compute EAD = drawn + CCF × undrawn. Use the CCF given in the question.
  • Taking LGD as the recovery rate. Fix: Write LGD = 1 − recovery before any multiplication.
  • Dividing capital by total assets instead of RWA Fix: CRAR always has RWA in the denominator. Weight every asset first.
  • Applying the risk weight to the notional of an off-balance sheet item Fix: Multiply by the CCF first, then by the counterparty risk weight.

Exam tips

  • For 'identify the type' MCQs, look for the root cause in the scenario: loan repayment, trade settlement, bunching of exposure, or foreign country conditions.
  • In written answers, define first, list sources, then classify. This order earns marks for structure.
  • Write the expected loss formula only when numbers are given; otherwise just define the terms PD, LGD and EAD.
  • Show a simple percentage calculation for concentration questions and state your conclusion in words.
  • Always end with a control or mitigation point to show application, not recall.
  • Case questions reward application: always use the amounts, ratings and names given before adding theory.
  • In limit problems, show limit, existing exposure, headroom and proposal in four clear lines, then conclude.
  • Name the board, the risk committee and the independent credit risk function; examiners look for who does what.