CMA Final · Strategic Cost Management
Just in Time (JIT): formula sheet
Key formulas
- JIT in one line
- Produce only what is needed, when it is needed, in the quantity needed
- Use this as your opening definition in any answer.
- Pull system vs push system
- Pull: production triggered by actual demand. Push: production triggered by forecast or schedule
- JIT is a pull system. Traditional manufacturing is typically push.
- Core aim of JIT
- Eliminate waste + continuous improvement (Kaizen) + total quality
- These three ideas hold the philosophy together.
- Waste categories
- Overproduction, waiting, transport, over-processing, inventory, motion, defects
- Seven commonly cited wastes from the Toyota Production System. Name as many as the question needs.
- Number of kanbans
- N = D × L × (1 + S) ÷ C
- D = demand per unit time, L = lead time (same time unit as D), S = safety factor as a decimal, C = container capacity in units. Always round N up to a whole number.
- Maximum inventory in the loop
- Maximum stock = N × C
- Cards in circulation multiplied by container size caps the stock for that part.
- Lead time
- L = waiting time + processing time + move time (+ other delays)
- Convert to the same unit as demand before using the kanban formula.
- Pull rule
- No kanban = no production and no movement
- Use this to separate pull from push. Push is driven by schedule or forecast.
- Standard cost per unit
- Standard cost per unit = Standard material cost + Standard conversion cost
- This rate is used to flush costs to finished goods and cost of goods sold.
- Cost flushed on completion
- Cost to Finished Goods = Units completed × Standard cost per unit
- Used when the trigger is completion of production.
- Cost flushed on sale
- Cost of Goods Sold = Units sold × Standard cost per unit
- Used when the trigger is sale. Under a sale-only trigger, there may be no finished goods entry.
- Conversion cost applied
- Conversion cost applied = Units produced × Standard conversion cost per unit
- Credit Conversion Cost Control, debit Finished Goods or Cost of Goods Sold as per the trigger. Where sale is the trigger, the units costed are the units sold.
- Under or over-applied conversion cost
- Actual conversion cost incurred − Conversion cost applied
- A positive figure is under-applied (a debit balance), a negative figure is over-applied. Normally adjusted to Cost of Goods Sold.
- Common trigger point sets
- Set 1: purchase of materials, completion of production and sale. Set 2: purchase of materials and sale. Set 3: completion of production and sale only.
- Which entries appear, and where stock is held, depends on the trigger set.
- Net benefit of adopting JIT
- Net annual benefit = Annual savings from JIT − Annual additional costs of JIT
- Savings: inventory carrying cost, space, scrap and rework, handling. Extra costs: higher purchase price, more frequent deliveries, training, lost-sales risk.
- Inventory carrying cost saved
- Saving = Reduction in average inventory (₹) × Carrying cost rate (%)
- Carrying cost rate includes interest on funds, insurance, storage and obsolescence.
- Payback on JIT investment
- Payback period = One-time implementation cost ÷ Net annual benefit
- Use when the one-time cost is a lump sum and benefits are even each year.
- One-time release of working capital
- Cash released = Opening inventory − Inventory after JIT
- This is a one-time gain, not a yearly saving. Only the carrying cost on it recurs.
Quick revision
- JIT means producing and buying only what is needed, when it is needed, in the quantity needed.
- The main aim is to remove waste and reduce inventory, lead time and set-up time.
- JIT is a pull system: production is triggered by demand, not by forecasts.
- Traditional systems push production through the plant based on schedules.
- High quality at source and few defects are essential for JIT to work.
- Close, reliable relationships with a small number of suppliers are a core prerequisite.
- Kanban is a card or signal system that authorises production or movement of materials.
- Backflush costing records costs after the event, working backward from output.
- Backflush costing reduces detailed tracking and may drop the raw material or work-in-process account.
- Key limits of JIT are supply disruption risk and dependence on stable demand.
- JIT needs employee involvement, multi-skilled workers and a culture of continuous improvement.
- In a case question, link JIT suitability to demand stability and supplier reliability before recommending.
Common mistakes
- Describing JIT only as an inventory reduction technique Fix: Say JIT is a philosophy covering production, purchasing, quality, people and suppliers, with low inventory as one result.
- Mixing up push and pull systems Fix: Remember: pull is triggered by demand from the next stage or customer; push is triggered by forecast or schedule.
- Saying JIT means no inventory at all and nothing else. Fix: Say JIT aims to minimise stock by removing the causes of it: poor quality, long setups and unreliable supply.
- Treating small lot size as a free choice, without setup reduction. Fix: Always write that small lots are viable only when setup time and cost are cut sharply.
- Treating kanban as the same thing as JIT Fix: Say that JIT is the philosophy and kanban is one control tool used to run a pull system.
- Describing the signal as moving forward Fix: Material flows forward, but the kanban signal flows backward from the user stage to the supplier stage.
- Recording entries at every stage of production, as in normal job or process costing. Fix: Under backflush, only trigger points create entries. Check the question and post only at those points.
- Using actual cost instead of standard cost when flushing to finished goods or COGS. Fix: Purchases go in at actual cost. Flushing uses standard cost per unit.
- Treating the release of inventory as a yearly saving. Fix: Treat it as one-time cash released. Only the carrying cost on it is a recurring saving.
- Saying JIT and lean are the same. Fix: State that JIT centres on inventory and timing, while lean covers all waste across the value chain and focuses on customer value. JIT is a part of lean.
Exam tips
- Begin every theory answer with a crisp definition and the Toyota origin. It earns easy marks.
- In case questions, quote the facts given, such as stock levels or lead times, and connect them to JIT principles.
- Be ready to contrast JIT with traditional systems: pull vs push, minimum stock vs buffer stock, few suppliers vs many, quality at source vs inspection at the end.
- For MCQs, watch for options that sound right but describe traditional practice, such as production based on forecasts or large safety stocks.
- Write a balanced conclusion with one benefit and one limitation when the question says evaluate or discuss.
- Expect a 14-mark theory answer asking for elements or prerequisites. Use six bold headings and a reason under each.
- In case-based MCQs, match the problem in the scenario (long setup, many suppliers) to the matching element.
- For comparison questions, use a point-by-point list with at least five pairs. Do not write long paragraphs.