Skip to content

CMA Final · Strategic Cost Management

Target Costing: formula sheet

Full chapter guide

Key formulas

Target cost
Target Cost = Target Selling Price − Target Profit
Price comes from the market. Cost is the balancing figure.
Target profit on sales
Target Profit = Target Selling Price × Required profit margin %
If the profit is given as a markup on cost, convert it to a margin on selling price first. A 25% markup on cost equals 20% on selling price.
Target profit on investment
Target Profit = Capital employed × Required return %
Divide by the number of units to get profit per unit.
Cost gap
Cost Gap = Estimated Current Cost − Target Cost
A positive gap means cost must be reduced. Zero or negative means the target is met.
Cost-plus price
Selling Price = Cost + Markup
Traditional approach. Target costing uses Cost = Price − Profit.
Target cost
Target cost = Target selling price − Target profit
Target profit may be given as an amount or as a percentage of selling price or of cost. Read which.
Cost gap (cost reduction required)
Cost gap = Expected (current) cost − Target cost
A positive gap means cost must be reduced. The team must close it through design changes.
Target profit on sales
Target profit = Selling price × Required margin %
If margin is on cost, profit = Cost × margin %, and selling price = Cost × (1 + margin %).
Target profit (on sales)
Target profit = Target selling price × Desired profit % on sales
Use this when the margin is given as a percentage of selling price.
Allowable cost
Allowable cost = Target selling price − Target profit
Also equals Target price × (1 − margin % on sales).
Target price from cost plus mark-up (check)
Price = Cost × (1 + mark-up %)
Only for converting a mark-up on cost into a margin on sales. Mark-up m on cost equals margin m ÷ (1 + m) on sales.
Cost gap
Cost gap = Drifting (current) cost − Allowable (or target) cost
Positive means the cost must be reduced. State which benchmark you used.
Target profit from ROI
Target profit = Capital employed × Required return %
Divide by units to get profit per unit. Use the same period for profit and units.
Gap as a percentage
Gap % = Cost gap ÷ Drifting cost × 100
Shows how much of the current cost must be cut.
Target cost
Target cost = Target selling price − Target profit
Target profit may be given as a margin on price or on cost. Read the base carefully.
Cost gap (cost reduction required)
Cost gap = Estimated (current) cost − Target cost
This is the amount VE and other methods must remove per unit or in total.
Value index
Value index = Function's share of customer value (%) ÷ Function's share of cost (%)
Below 1 means over-costed, so look for savings. Above 1 means under-costed relative to its value. Near 1 is balanced.
Target cost of a function
Function target cost = Function's value weight × Overall target cost
Compare with the function's current cost to find the reduction needed for that function.
Value (concept)
Value = Function (benefit to customer) ÷ Cost
VE raises value by keeping function and lowering cost, or by raising function at the same cost.
Target cost
Target cost = Target selling price − Target profit
Target profit may be given as an amount or as a % of selling price or of cost. Read the base carefully.
Cost gap
Cost gap = Estimated current cost − Target cost
A positive gap must be closed by value engineering, supplier negotiation or process change.
Kaizen cost target
Kaizen target cost for the year = Previous year's actual cost × (1 − kaizen reduction %)
Applied to the cost base of the existing product. Check whether the % applies to total cost or to a single cost item.
Life-cycle cost
Life-cycle cost = Upstream cost (R&D, design) + Manufacturing and distribution cost + Downstream cost (service, warranty, disposal)
Per-unit life-cycle cost = Total life-cycle cost ÷ Total units over the life.
Target life-cycle profit check
Life-cycle profit = Total life-cycle revenue − Total life-cycle cost
The product is viable only if this meets the required profit over the whole life, not just in one year.

Quick revision

  • Target costing works backward from market price, not forward from cost.
  • Target Cost = Target Selling Price − Target Profit.
  • Cost Gap = Current Estimated Cost − Target Cost; a positive gap means cost must come down.
  • If profit is a percentage of sales, take it off the price. If it is a percentage of cost, divide the price by (1 + percentage).
  • Cost is designed in at the planning and design stage, where most of it gets locked in.
  • Cross-functional teams of design, production, marketing and finance work on the target together.
  • Value engineering reviews design and function before production to remove cost the customer does not value.
  • Value analysis does the same review for existing products.
  • Kaizen costing delivers small, continuous cost cuts during the production stage.
  • Life-cycle costing tracks cost from design to disposal, so savings in one stage should not raise cost in another.
  • Always end a numerical answer with a clear recommendation.

Common mistakes

  • Adding a markup to cost to find the price. Fix: Start from the price. In target costing, cost is derived: Price − Profit.
  • Treating a markup on cost as a margin on sales. Fix: Read the base. If it is on cost, convert: 25% on cost is 25 ÷ 125 = 20% of selling price.
  • Describing target costing as cost plus profit equals price. Fix: Always write the direction: price first, then subtract profit to reach the cost.
  • Saying cost reduction happens mainly during production. Fix: State that target costing focuses on design. Savings after launch are limited because most cost is already committed.
  • Treating a margin on cost as a margin on sales Fix: Read the base. If it is on cost, price = cost × 1.20. If it is on sales, allowable cost = price × 0.80. Convert if the question mixes the two.
  • Subtracting in the wrong direction for the cost gap Fix: Always write drifting cost first. A positive answer means cost must fall.
  • Treating value engineering and value analysis as the same thing. Fix: Say that VE applies before production at design stage and VA applies to products already in production. Link VE to target costing.
  • Calculating the target cost wrongly when profit is stated as a percentage of cost. Fix: If profit is x% on cost, cost = price ÷ (1 + x). If it is x% on price, cost = price × (1 − x).
  • Calculating profit as a % of cost when the question gives it as a % of selling price. Fix: Underline the base word (on sales / on cost). If on sales, target cost = price × (1 − profit %). If on cost, target cost = price ÷ (1 + profit %).
  • Treating kaizen costing as the same as target costing. Fix: Remember the stage. Target costing is before launch and starts from price. Kaizen is after launch and starts from last year's actual cost.

Exam tips

  • In a numerical, show the three lines separately: target price, target profit, target cost. Marks are given for each line.
  • Check whether profit is on cost or on sales before computing anything. Examiners often set this trap.
  • When asked to compare with cost-plus pricing, write the direction of logic for each: cost-plus is cost → price, target costing is price → cost.
  • End every case answer with a recommendation and one or two practical cost-reduction actions.
  • In MCQs, remember target cost is a ceiling set before launch, not a historical cost.
  • Open any theory answer with the formula: target cost = price − profit. It shows the direction at once.
  • For advantages and limitations questions, give a balanced list with at least two points on each side.
  • In case questions, name the cross-functional team members and customer features from the scenario.