CMA Foundation · Fundamentals of Financial and Cost Accounting
Application of Cost Accounting for Business Decisions: formula sheet
Key formulas
- Marginal cost
- Marginal cost = Direct material + Direct labour + Direct expenses + Variable overheads
- Variable overheads include variable factory, administration and selling overheads when asked for total variable cost.
- Contribution
- Contribution = Sales − Variable cost
- Variable cost here includes variable selling cost on units sold.
- Marginal cost equation
- Sales − Variable cost = Contribution; Contribution − Fixed cost = Profit
- Equivalent form: Sales − Variable cost = Fixed cost + Profit.
- Contribution per unit
- Contribution per unit = Selling price per unit − Variable cost per unit
- Total contribution = Contribution per unit × Units sold.
- P/V ratio
- P/V ratio = Contribution ÷ Sales × 100
- Also called contribution to sales ratio. Contribution = Sales × P/V ratio.
- Profit difference between the two methods
- Absorption profit − Marginal profit = Fixed overhead in closing stock − Fixed overhead in opening stock
- Use the fixed overhead rate per unit × change in stock units, when the rate is the same in both years.
- Contribution
- Contribution = Sales − Variable cost = Fixed cost + Profit
- Works per unit or in total.
- P/V ratio
- P/V ratio = Contribution ÷ Sales × 100
- Also = Change in profit ÷ Change in sales × 100, when fixed cost is unchanged.
- Break-even point (units)
- BEP (units) = Fixed cost ÷ Contribution per unit
- Use when per-unit data is given.
- Break-even point (value)
- BEP (₹) = Fixed cost ÷ P/V ratio
- Also = BEP units × selling price per unit.
- Margin of safety
- MOS = Actual sales − Break-even sales = Profit ÷ P/V ratio
- MOS ratio = MOS ÷ Actual sales × 100.
- Target profit sales
- Required sales (₹) = (Fixed cost + Target profit) ÷ P/V ratio
- In units: (Fixed cost + Target profit) ÷ Contribution per unit.
- Profit from P/V ratio
- Profit = Sales × P/V ratio − Fixed cost
- Quick way to find profit at any sales level.
- Contribution
- Contribution = Sales − Variable cost
- Per unit or in total. Profit = Contribution − Fixed cost.
- Make or buy rule
- Make if variable cost of making (plus avoidable fixed cost, if any) < buying price
- Ignore unavoidable fixed costs. If capacity is limited, use the key factor rule instead.
- Special order rule
- Accept if offer price > variable cost per unit (and spare capacity exists, no extra fixed cost)
- If the order needs extra fixed cost, deduct it from the total extra contribution.
- Key factor ranking
- Contribution per unit of key factor = Contribution per unit ÷ Key factor units per product unit
- Rank products from highest to lowest and allocate the scarce resource in that order, up to demand.
- Shutdown rule
- Continue if Segment contribution > Avoidable fixed cost of the segment
- Shut down if segment contribution is less than the fixed costs saved by closing it.
- Key factor (limiting factor)
- Maximise total contribution subject to the single scarce resource
- Valid with only one limiting factor. More than one needs linear programming.
- Material Cost Variance (MCV)
- MCV = (SQ × SP) − (AQ × AP)
- SQ is standard quantity for actual output. Positive result is F, negative is A.
- Material Price Variance (MPV)
- MPV = AQ × (SP − AP)
- If the variance is computed at the time of purchase, AQ is the quantity purchased. Otherwise AQ is the quantity used. Follow what the question states; if it says nothing and purchases equal usage, the two are the same.
- Material Usage Variance (MUV)
- MUV = SP × (SQ − AQ)
- SQ is standard quantity for actual output. AQ is the quantity used. Valued at standard price.
- Check for material
- MCV = MPV + MUV
- Works when the quantity purchased equals the quantity used. Use this to verify your answers.
- Labour Cost Variance (LCV)
- LCV = (SH × SR) − (AH paid × AR)
- SH is standard hours for actual output. AH paid is the hours the workers were paid for, including idle hours.
- Labour Rate Variance (LRV)
- LRV = AH paid × (SR − AR)
- Uses hours paid. AH paid = AH worked + idle hours.
- Labour Efficiency Variance (LEV)
- LEV = SR × (SH − AH worked)
- Uses hours actually worked, not hours paid. AH worked = AH paid − idle hours.
- Idle Time Variance
- Idle time variance = Idle hours × SR
- Always adverse (A). Idle hours = AH paid − AH worked.
- Check for labour
- LCV = LRV + LEV + Idle time variance
- LRV uses hours paid and LEV uses hours worked. If there is no idle time, the idle time variance is zero.
- Variable Overhead Cost Variance
- VOH variance = (SH × Standard rate per hour) − Actual variable overhead
- Standard rate = budgeted variable overhead ÷ budgeted hours.
- Fixed Overhead Cost Variance
- FOH cost variance = (Actual output × Standard rate per unit) − Actual fixed overhead
- This is absorbed overhead minus actual overhead. Positive is F.
- Fixed Overhead Expenditure Variance
- Budgeted fixed overhead − Actual fixed overhead
- Positive is F.
- Fixed Overhead Volume Variance
- Absorbed fixed overhead − Budgeted fixed overhead
- Equals standard rate × (actual output − budgeted output). Positive (over-absorption) is F.
- Check for fixed overhead
- FOH cost variance = Expenditure variance + Volume variance
- (Budgeted − Actual) + (Absorbed − Budgeted) = Absorbed − Actual. Use this to verify your overhead answers.
- Production budget (units)
- Production = Budgeted sales + Closing stock − Opening stock
- Use finished goods units. Closing stock is the target at period end.
- Purchase budget (units of material)
- Purchases = Material consumed + Closing stock of material − Opening stock of material
- Material consumed = Production units × material per unit.
- Flexible budget cost
- Total cost at new level = Fixed cost + (Variable cost per unit × Units at new level)
- Fixed cost stays the same in total within the relevant range. Variable cost per unit stays the same.
- Variable cost per unit from a budget
- Variable cost per unit = Total variable cost ÷ Units of budgeted activity
- Semi-variable costs must first be split into fixed and variable parts.
- Closing cash balance
- Closing cash = Opening cash + Receipts − Payments
- Leave out non-cash items such as depreciation. Include only actual cash timing.
- Key factor rule
- Start the budgets from the limiting factor
- If sales is the key factor, the sales budget is prepared first.
Quick revision
- Contribution = Sales − Variable cost.
- Profit = Contribution − Fixed cost.
- P/V ratio = Contribution ÷ Sales × 100.
- Break-even point (units) = Fixed cost ÷ Contribution per unit.
- Break-even sales (₹) = Fixed cost ÷ P/V ratio.
- Margin of safety = Actual sales − Break-even sales.
- Sales for a target profit = (Fixed cost + Target profit) ÷ P/V ratio.
- In marginal costing, fixed costs are treated as period costs and stock is valued at variable cost.
- With a scarce resource, rank products by contribution per unit of that resource.
- Material cost variance = (Standard quantity × Standard price) − (Actual quantity × Actual price).
- Material price variance = (Standard price − Actual price) × Actual quantity.
- A flexible budget changes with the level of activity; a fixed budget does not.
Common mistakes
- Treating fixed cost as part of product cost under marginal costing. Fix: Under marginal costing, only variable costs go into product cost and stock value. Fixed cost is deducted in full from contribution.
- Calculating contribution on units produced instead of units sold. Fix: Contribution and sales always relate to units sold. Production matters only for stock valuation and absorption costing.
- Using selling price instead of contribution per unit in the BEP formula. Fix: Always compute selling price − variable cost per unit first and divide by that.
- Forgetting to add target profit to fixed cost. Fix: Required contribution = Fixed cost + Target profit. Divide this by contribution per unit or P/V ratio.
- Using full cost (including absorbed fixed overhead) to compare make with buy. Fix: Use only variable cost plus any fixed cost that can really be saved if you stop making.
- Ranking products by contribution per unit when a resource is scarce. Fix: Rank by contribution per unit of the scarce resource, such as per machine hour.
- Using budgeted output instead of actual output to find standard quantity. Fix: Always scale standards to actual units produced before comparing with actual quantities.
- Reversing the sign and calling an adverse variance favourable. Fix: Use standard (or absorbed) minus actual (or budgeted) in the forms given on this page, so positive is always F, then confirm by logic: higher actual cost means adverse.
- Scaling all costs in proportion to activity in a flexible budget. Fix: Scale only variable costs. Keep fixed costs as they are.
- Including depreciation in the cash budget. Fix: Depreciation is a non-cash item. Leave it out of cash payments.
Exam tips
- Most questions are numeric and fast. Write S − V = F + P first, then fill in the numbers.
- Always check whether the question gives units produced and units sold separately. Use sold units for contribution.
- For profit differences between the two methods, calculate only the fixed overhead in stock change. It saves time.
- Watch for the words 'marginal cost' and 'variable cost' used interchangeably in options, and read each option fully.
- Since there is no negative marking, attempt every question. Eliminate options that ignore fixed cost or use the wrong units.
- Most questions need only contribution, P/V ratio and fixed cost. Compute these first.
- Check whether the answer is asked in units or rupees before choosing an option.
- If a question gives profit at two sales levels, find P/V ratio from the change in profit ÷ change in sales.