Core idea of forecasting
Forecast = Past data + Expected changes in conditions + Management assumptions
This is a way to remember the method, not a mandatory formula. Say that forecasts rest on assumptions.
Forecast vs budget (key contrast)
Forecast = what is likely to happen; Budget = what management wants to happen and commits to
A forecast is an estimate and is flexible. A budget is a target and is used for control.
Funds need (link to later topics)
Additional funds needed = Forecast increase in assets − Forecast increase in liabilities and retained profit
Forecasting statements are used to find this. The detailed method is studied under External Funds Requirement.
Percentage of sales ratio
Item as % of sales = (Item ÷ Sales) × 100
Use for items that vary directly with sales, such as inventory, receivables and payables.
Forecast item (percentage of sales)
Forecast item = Forecast sales × (Item ÷ Current sales)
Fixed assets are scaled only if capacity is fully used.
Growth rate
Growth rate = (Current sales − Previous sales) ÷ Previous sales × 100
Trend method: forecast = latest figure × (1 + growth rate).
Regression line
Y = a + bX
Y is the forecast variable, X the driver, a the fixed part and b the change in Y per unit of X.
Slope of regression line
b = (nΣXY − ΣX·ΣY) ÷ (nΣX² − (ΣX)²)
Then a = (ΣY − bΣX) ÷ n.
Forecast sales
Forecast sales = Current sales × (1 + growth rate)
Use the growth rate given. If an absolute increase is given, add it to current sales.
Percentage of sales
Item as % of sales = (Base year item ÷ Base year sales) × 100
Apply only to items that vary directly with sales.
Projected item
Projected item = Forecast sales × Item % of sales
Use for cost of goods sold, expenses, debtors, stock, creditors when assumed proportionate.
Retained earnings addition
Addition to reserves = Projected PAT − Dividends
Equals PAT × (1 − payout ratio) when a payout ratio is given.
Projected PAT
PAT = PBT − Tax = PBT × (1 − tax rate)
Compute interest on the loans stated in the question before PBT.
Debtors from days
Debtors = Credit sales × Debtor days ÷ 365
Use 360 days if the question says so. Stock and creditors use cost-based figures: Inventory = COGS × days ÷ 365.
External funds required
EFR = Projected total assets − (Projected liabilities + Projected equity before EFR)
A positive result is a funding need. A negative result is surplus.
External Funds Requirement (AFN)
EFR = (A/S) × ΔS − (L/S) × ΔS − [PM × S1 × (1 − d)]
A/S = spontaneous assets as a ratio of sales; L/S = spontaneous liabilities as a ratio of sales; ΔS = increase in sales; S1 = projected sales; PM = net profit margin on projected sales; d = dividend payout ratio.
Retained earnings for the year
Retained earnings = PM × S1 × (1 − d)
Use projected sales S1, not current sales, unless the question says otherwise.
Increase in sales
ΔS = S1 − S0
If growth is given as a percentage g, then ΔS = S0 × g.
Cash budget closing balance
Closing cash = Opening cash + Receipts − Payments
Opening cash of one period is the closing cash of the previous period.
Financing need in cash budget
Surplus or deficit = Closing cash before financing − Minimum cash balance
A negative figure means borrowing is needed; a positive figure means surplus.

Quick revision

  • Forecasting is estimating future financial results and position from past data and expected conditions.
  • Sales forecast is usually the starting point; most other items are linked to it.
  • Qualitative methods rely on judgement and opinion; quantitative methods rely on data and statistics.
  • Percent-of-sales method assumes selected items change in proportion to sales.
  • Pro forma statements are projected statements, not actual results.
  • Fixed assets may not rise with sales if there is spare capacity; state your assumption.
  • Spontaneous liabilities such as trade creditors rise with sales; borrowings and share capital do not automatically.
  • EFR = Increase in required assets − Increase in spontaneous liabilities − Increase in retained earnings.
  • Retained earnings addition = Projected net profit × retention ratio.
  • Cash budget shows cash receipts and payments by period, not profit.
  • Non-cash items such as depreciation are excluded from a cash budget.
  • Always write your assumptions at the start of the answer.

Common mistakes

  • Treating forecasting and budgeting as the same thing Fix: Remember that a forecast predicts what is likely, while a budget sets what management aims for and uses as a yardstick for control.
  • Writing that a forecast is a guaranteed result Fix: Always say forecasts are estimates based on assumptions and are revised when conditions change.
  • Scaling every item with sales Fix: Scale only items that vary with sales. Keep share capital, long-term debt and often fixed assets unchanged unless told otherwise.
  • Mixing up qualitative and quantitative methods Fix: Ask if the method uses past numbers. If it relies on opinion, it is qualitative.
  • Growing fixed items such as share capital and long-term loans with sales. Fix: Mark each item as variable or fixed before calculating. Keep fixed items unchanged unless the question adds capital or repays loans.
  • Forgetting to add retained earnings to reserves. Fix: After PAT and dividends, immediately write closing reserves = opening reserves + retained profit.
  • Using current sales instead of projected sales to compute retained earnings. Fix: Profit for the coming year comes from projected sales. Write S1 beside the formula before substituting.
  • Treating all liabilities as spontaneous. Fix: Only trade creditors and accruals normally rise with sales. Loans, debentures and share capital do not, unless stated.

Exam tips

  • Expect short theory questions: meaning, objectives, and difference between forecasting, budgeting and planning. Prepare all three.
  • Write the answer in points with one explanatory line each. Examiners reward structure.
  • For any distinction question, give at least four bases and end with the relationship between the two terms.
  • Use the words 'estimate', 'assumptions' and 'likely' when defining a forecast. They show you understand its nature.
  • Link the topic to later chapters, such as forecasting statements and funds requirement, to show depth in longer answers.
  • For theory, always split your answer into qualitative and quantitative methods and give two examples of each.
  • Write the formula before substituting numbers; marks are given for method.
  • State the assumption behind each method in one line.