FRM Part I · FRM Exam Part I
Using Futures for Hedging: formula sheet
Key formulas
- Basis
- Basis = Spot price of asset to be hedged − Futures price of contract used
- This is the usual convention. Check the sign convention in the question.
- Effective price, short hedge
- Price realised = S2 + F1 − F2 = F1 + b2
- F1 is the initial futures price, F2 and S2 are the futures and spot prices at close-out, b2 = S2 − F2 is the final basis.
- Effective price, long hedge
- Price paid = S2 + F1 − F2 = F1 + b2
- Same algebra as the short hedge, but now it is the cost you pay. Lower is better.
- Futures gain or loss
- Short: (F1 − F2) × contract size × contracts. Long: (F2 − F1) × contract size × contracts
- Rising futures prices help longs and hurt shorts.
- Perfect hedge
- Basis at close-out known with certainty, so price is locked at F1 + b2
- Basis risk is the uncertainty in b2.
- Basis
- Basis = S − F
- Spot of the asset being hedged minus futures price of the contract used. Some books use the reverse sign, so follow the question's definition.
- Effective price received (short hedge)
- Effective price = S2 + (F1 − F2) = F1 + b2
- F1 is the initial futures price, F2 the futures price at close-out, S2 the spot at close-out, b2 = S2 − F2.
- Effective price paid (long hedge)
- Effective price = S2 − (F2 − F1) = F1 + b2
- Same expression as the short hedge. Only b2 is uncertain.
- Basis direction rule
- Short hedger: gains if basis strengthens. Long hedger: gains if basis weakens.
- Strengthening means S − F increases; weakening means it decreases.
- Convergence
- Basis → 0 at delivery (same asset)
- Does not hold if the hedged asset differs from the futures underlying asset.
- Minimum variance hedge ratio
- h* = ρ × σS ÷ σF = Cov(ΔS, ΔF) ÷ Var(ΔF)
- σS and σF are standard deviations of changes in spot and futures prices over the hedge period. h* is the slope of the regression of ΔS on ΔF.
- Optimal number of contracts
- N* = h* × QA ÷ QF
- QA is the size of the position being hedged (units of the asset). QF is the size of one futures contract in the same units.
- Hedge effectiveness
- Effectiveness = ρ² = R² = 1 − Var(hedged) ÷ Var(unhedged)
- It is the proportion of variance eliminated.
- Variance of hedged position (per unit)
- Var = σS² + h² σF² − 2 h ρ σS σF
- At h = h*, this reduces to σS² × (1 − ρ²).
- Minimum hedged standard deviation
- σhedged = σS × √(1 − ρ²)
- Per unit of spot exposure. Multiply by the quantity hedged for the total.
- Number of contracts using values (tailing form)
- N* = h* × VA ÷ VF
- VA is the value of the position and VF is the value of one futures contract (futures price × contract size). Use it when the question gives values rather than units.
- Value of one index futures contract
- F = Futures index level × Contract multiplier
- Example: S&P 500 E-mini has a multiplier of $50. Use the futures price, not the spot level, unless the question says otherwise.
- Contracts for a full beta hedge
- N = β × V ÷ F
- This is the number of contracts to short, a magnitude. It equals the absolute value of (0 − β) × V ÷ F, so it follows the same sign convention as the general formula below. V is the portfolio value.
- Contracts to change beta to a target
- N = (β* − β) × V ÷ F
- β* is target beta, β is current beta. Positive N means go long. Negative N means go short. Setting β* = 0 gives the full hedge.
- Expected portfolio return (CAPM)
- E(Rp) = Rf + β × (E(Rm) − Rf)
- Used to find the expected return of the portfolio before hedging, or after hedging at the new beta. With β = 0 it gives Rf, but that is an expectation, not a guarantee, because basis risk and specific risk remain.
- Approximate hedged outcome
- Hedged value change ≈ Portfolio gain/loss + Futures gain/loss
- Futures gain on a short = (F0 − F1) × multiplier × N.
Quick revision
- A short hedge protects an asset you own or will sell; a long hedge protects a future purchase.
- Basis = spot price − futures price; a hedger is exposed to changes in basis. A strengthening basis benefits a short hedger; a weakening basis benefits a long hedger.
- Basis risk arises when the asset hedged differs from the futures asset or the dates do not match. It is why hedges are imperfect. Hedging with a different but related asset can also make h* differ from 1.
- Minimum variance hedge ratio: h* = ρ × σS ÷ σF.
- h* differs from 1 when ρ < 1 or σS ≠ σF.
- Number of contracts: N* = h* × QA ÷ QF.
- Hedge effectiveness equals ρ², the share of spot variance removed.
- h* is the slope from regressing spot price changes on futures price changes.
- If ρ = 1 and σS = σF, then h* = 1.
- Beta hedge contracts: N = (β* − β) × P ÷ A; a negative result means sell futures.
- To take beta to zero, sell β × P ÷ A contracts.
- Tailing adjusts the contract count by the ratio of the spot value of the exposure to the value of one futures contract: N* = h* × VA ÷ VF, where VA = QA × S and VF = QF × F. This equals h* × QA ÷ QF × (S ÷ F) and reflects daily settlement. The count falls when the futures price exceeds the spot price.
- Rolling a hedge forward adds basis risk at each roll date.
Common mistakes
- Choosing the wrong direction, for example going long to hedge an inventory you own. Fix: Hedge the exposure you want to cancel. If you lose when the price falls, sell futures. If you lose when the price rises, buy futures.
- Assuming a futures hedge locks in the price exactly. Fix: State that the locked price is F1 + b2. It is exact only when b2 is known, such as when the contract expires on the transaction date.
- Using the wrong sign for the basis Fix: Use S − F unless the question states otherwise, and write the definition before calculating.
- Saying a short hedger benefits from a weakening basis Fix: Short hedger: effective price = F1 + b2, so a larger b2 helps. Strengthening helps the short hedger.
- Using h* = ρ × σF ÷ σS (ratio inverted). Fix: Remember it is the slope of ΔS on ΔF, so spot volatility is on top. If futures are more volatile than spot, you need fewer than ρ per unit.
- Reporting effectiveness as ρ instead of ρ². Fix: Effectiveness is variance reduction, so it is ρ². ρ = 0.8 gives 64%.
- Using β × V ÷ F when the target beta is not zero. Fix: Use (β* − β) × V ÷ F for every case. For a full hedge it gives −β × V ÷ F, and β × V ÷ F is just the magnitude, the number of contracts to short.
- Forgetting the contract multiplier. Fix: Multiply the index level by the multiplier first. Write F down as a separate step.
Exam tips
- First decide who is exposed: a seller of the asset needs a short hedge and a buyer needs a long hedge. Many questions test only this.
- When a question gives the final basis, use effective price = F1 + b2 and skip the long calculation.
- For the why-hedge discussion, be ready with both sides: stable cash flows and lower distress costs for, and shareholder diversification, costs and competitive effects against.
- Read carefully whether the answer asks for the futures gain, the effective price or the total amount, and whether the hedge is in contracts or in units.
- Watch for statements that a hedge eliminates all risk. They are usually the wrong option, because basis risk remains.
- Write the basis definition first. Questions may define it as S − F, and the strengthen/weaken answer depends on it.
- Use the shortcut F1 + b2 to cross-check your longer calculation.
- Remember short hedger = strengthening is good; long hedger = weakening is good. Questions often test this directly.