Skip to content

FRM Part II · FRM Exam Part II

Risk Management for Changing Interest Rates: Asset-Liability Management and Duration Techniques: formula sheet

Opens the print dialog. Choose "Save as PDF".
Full chapter guideFlashcards for this chapter

Key formulas

Net interest income
NII = Interest income − Interest expense
The main target of the earnings perspective.
Repricing gap
Gap = Rate-sensitive assets (RSA) − Rate-sensitive liabilities (RSL)
Computed per time bucket. Positive gap means asset-sensitive.
Change in NII from gap
ΔNII ≈ Gap × Δr
Applies to a one-year horizon for items repricing at the start. Use the fraction of the year remaining for later buckets.
Economic value of equity
EVE = PV(assets) − PV(liabilities) ± PV(off-balance-sheet)
The economic value perspective. ΔEVE is measured under rate shocks.
Duration approximation
ΔPV ≈ −D × PV × Δr (D = modified duration)
First-order estimate. Ignores convexity and non-parallel shifts.
Repricing gap
Gap = RSA − RSL
Measured for a time bucket. Positive means asset-sensitive; negative means liability-sensitive.
Cumulative gap
CGap(T) = Σ (RSA − RSL) over all buckets up to horizon T
Use the cumulative gap for the NII effect over the whole horizon.
Change in NII
ΔNII = Gap × Δr
Applies to a parallel rate shift, with Δr in decimal. Use the cumulative gap for the horizon.
Time-weighted NII effect
ΔNII = Σ Gapᵢ × Δr × (fraction of horizon remaining after bucket i reprices)
Use when buckets reprice at different points in the year, for example a mid-point of 6 months gives a weight of 0.5 on a 1-year horizon.
Relative gap
Relative gap = Gap ÷ Total assets
Lets you compare banks of different sizes.
Gap ratio
Gap ratio = RSA ÷ RSL
Above 1 means asset-sensitive; below 1 means liability-sensitive.
Macaulay duration
D_Mac = Σ [t × PV(CF_t)] ÷ P
t is time in years. PV(CF_t) is the present value of the cash flow at time t. P is the bond price.
Modified duration
D_mod = D_Mac ÷ (1 + y/m)
y is the annual yield and m the number of coupons per year. For annual compounding, divide by (1 + y).
Duration approximation of price change
ΔP/P ≈ −D_mod × Δy
Δy in decimals. A 25 bp rise is 0.0025. Valid for small, parallel yield changes.
Duration plus convexity approximation
ΔP/P ≈ −D_mod × Δy + ½ × C × (Δy)²
C is convexity. Use the same compounding basis for D_mod and C.
Effective duration
D_eff = (P₋ − P₊) ÷ (2 × P₀ × Δy)
P₋ is the price after yields fall by Δy, P₊ after yields rise by Δy, P₀ the starting price.
Effective convexity
C_eff = (P₋ + P₊ − 2 × P₀) ÷ (P₀ × (Δy)²)
Same shifts as effective duration. Can be negative for callable bonds and mortgage securities.
Portfolio duration
D_p = Σ w_i × D_i
w_i is the market-value weight. Convexity of a portfolio is weighted the same way.
Dollar duration (DV01 link)
DV01 ≈ D_mod × P × 0.0001
The price change in currency for a 1 bp move in yield.
Equity identity
E = A − L
Use market values, not book values, for EVE.
Duration gap
DGAP = D_A − (L ÷ A) × D_L
D_A and D_L are the modified or Macaulay durations, but use the same type for both. L ÷ A is the liability-to-asset ratio.
Change in asset value
ΔA ≈ −D_A × A × Δy ÷ (1 + y)
With modified duration, drop the division by (1 + y) and use ΔA ≈ −D_mod × A × Δy.
Change in EVE
ΔE ≈ −DGAP × A × Δy ÷ (1 + y)
Valid for small parallel shifts. Equivalent to ΔA − ΔL.
Percentage change in EVE
ΔE ÷ E ≈ −DGAP × (A ÷ E) × Δy ÷ (1 + y)
A ÷ E is the leverage multiplier. It amplifies the effect on equity.
Immunization condition
D_A = (L ÷ A) × D_L
DGAP = 0. Equity value is protected against small parallel yield shifts.
Price change from duration
ΔP ÷ P ≈ -D_mod × Δy
D_mod = Macaulay duration ÷ (1 + y) for annual compounding. Valid for small moves.
DV01
DV01 ≈ D_mod × P × 0.0001
Value change for a one basis point rise in yield. Quote as a positive number.
DV01 hedge ratio
N = DV01_portfolio ÷ DV01_hedge instrument
Take the opposite position to the exposure. Hedge DV01 must equal portfolio DV01.
Duration-based futures hedge
N = (D_P × P) ÷ (D_F × F)
D_P and D_F are modified durations of portfolio and futures (or cheapest-to-deliver). F is the futures contract value.
Bank duration gap
DGAP = D_A - (L ÷ A) × D_L
Equity change ≈ -DGAP × A × Δy ÷ (1 + y). Zero gap means equity is immunized for small parallel shifts.
Classical immunization conditions
PV(assets) = PV(liabilities) and D_A = D_L
This applies to funding a liability, not to a leveraged bank's equity, where D_A = (L ÷ A) × D_L. Also want asset convexity at least as large as liability convexity. Assumes a parallel shift, once.
Swap value to fixed payer
V_pay-fixed = PV(floating leg) - PV(fixed leg)
Pay-fixed swap behaves like long a floating bond and short a fixed bond, so it has negative duration. Sign convention: a receive-fixed swap has duration = fixed-leg duration minus floating-leg duration. A pay-fixed swap has the negative of that.
Duration price approximation
ΔP ÷ P ≈ -D × Δy
Valid for small, parallel yield changes. D is modified duration for fixed cash flows.
Duration plus convexity
ΔP ÷ P ≈ -D × Δy + ½ × C × (Δy)²
Convexity improves the estimate for larger moves. Negative convexity means the second term hurts you.
Effective duration
D_eff = (P₋ - P₊) ÷ (2 × P₀ × Δy)
P₋ and P₊ are prices after yields fall and rise by Δy, using a model that lets cash flows change. Use it for bonds with options and for MBS.
Key rate duration
KRD_i = -(1 ÷ P) × (ΔP_i ÷ Δy_i)
Only key rate i is shifted. Other key rates are held constant.
Sum of key rate durations
Σ KRD_i ≈ effective duration
Holds when all key rates move by the same amount (a parallel shift).
Portfolio price change from curve shifts
ΔP ÷ P ≈ -Σ (KRD_i × Δy_i)
Use the actual yield change at each key rate.

Quick revision

  • Repricing gap = rate-sensitive assets − rate-sensitive liabilities in a time bucket.
  • Change in net interest income ≈ gap × change in rates, for that bucket's horizon.
  • A positive gap gains income when rates rise; a negative gap loses.
  • Modified duration = Macaulay duration ÷ (1 + y) for annual compounding.
  • ΔP ÷ P ≈ −D_mod × Δy + ½ × C × (Δy)².
  • Convexity helps the holder: gains from falling rates exceed losses from rising rates, for the same size move.
  • Duration gap = D_A − (L ÷ A) × D_L.
  • Positive duration gap: equity value falls when rates rise.
  • ΔEVE ≈ −DGap × A × Δy ÷ (1 + y).
  • Immunization matches duration, and protects only against small parallel shifts.
  • A pay-fixed swap adds a fixed-rate liability and a floating-rate asset. It effectively shortens asset duration (or lengthens liability duration), so it helps a bank with a positive duration gap, such as one with long-dated fixed-rate assets funded by short-term liabilities. It would not help a bank whose liabilities are already longer than its assets, because that bank has a negative duration gap.
  • Duration fails for large moves, non-parallel shifts and options such as prepayment.

Common mistakes

  • Treating NII and EVE as the same measure. Fix: NII is a short-horizon income flow. EVE is the present value of all future cash flows. They can move in opposite directions.
  • Counting fixed-rate items as rate-sensitive. Fix: Only items that reprice or mature within the horizon are rate-sensitive.
  • Counting all assets and liabilities as rate sensitive. Fix: Include only items that reprice or mature within the horizon. Leave out later-repricing and non-interest-bearing items.
  • Getting the sign of the effect backwards. Fix: Positive gap plus rising rates means NII rises. Negative gap plus rising rates means NII falls. Reverse both for falling rates.
  • Using Macaulay duration directly in the price change formula. Fix: Divide Macaulay duration by (1 + y/m) first. Only modified duration gives percentage price sensitivity.
  • Forgetting the sign, so a yield rise gives a price gain. Fix: State the direction before calculating. Yield up means price down. Convexity is the only positive term.
  • Subtracting D_L from D_A without weighting by L ÷ A. Fix: Always scale liability duration by L ÷ A. Equity funding makes assets larger than liabilities.
  • Getting the sign of the equity change wrong. Fix: Put the minus sign in the formula: ΔE = −DGAP × A × Δy. Positive gap and rising rates give a loss.
  • Matching asset and liability duration but not present values. Fix: Check D_A = D_L and PV_A = PV_L. For a leveraged bank, use the duration gap with L ÷ A.
  • Using the wrong direction for the hedge. Fix: Ask who loses if rates rise. Long bonds lose, so short futures or pay-fixed swap. Say the direction before computing.

Exam tips

  • Read whether the question asks about earnings or economic value before calculating anything.
  • Watch the timing: items repricing part-way through the year get a fractional effect.
  • Expect conceptual items on basis risk, yield curve risk and optionality, not only calculations.
  • Link the result to ALM action: a negative gap and falling NII may call for receive-fixed swaps or shorter-duration assets.
  • Know that gap analysis ignores value effects and convexity, which is why EVE is used as well.
  • Read whether the question wants a bucket gap or a cumulative gap, and whether the simple or the time-weighted formula applies.
  • Expect conceptual items on limitations: basis risk, optionality, non-parallel shifts, the earnings-only view and non-maturity deposit assumptions.
  • Check the sign last. A wrong sign is the easiest way to lose a mark on a question where the arithmetic is right.