Skip to content

Cost and Management Accounting · Job Costing

Job Costing Numericals: Pricing, Profit and Overheads

Updated 4 October 2026 · Fact-checked

Job costing numericals ask you to build the cost of one job from materials, labour, direct expenses and absorbed overheads, then add profit to reach a price. Work in order: prime cost, overhead at the given rate, adjust for spoilage and work in progress, total cost, then profit on cost or on sales.

Understand Job Costing Numericals: Pricing, Profit and Overheads

In job costing, each job is a separate cost unit. You collect its materials, labour and direct expenses on a job cost sheet. Overheads are not traced to the job. You add them using a rate, so every job carries a fair share.

The overhead absorption rate is budgeted overhead divided by a budgeted base, such as direct labour hours, machine hours or direct wages. The job then absorbs: rate × actual base units used by that job. If the question gives a rate, use it. If it gives totals, compute the rate first.

The quotation price is total cost plus profit. The profit is stated either as a percentage of cost (mark-up) or as a percentage of sales (margin). These give different prices, so read the wording closely.

Two twists appear often. Work in progress (WIP) means a job is incomplete at the period end. Only the cost incurred so far is carried forward. Spoilage or defectives mean some units fail. Normal loss is part of the job cost. Abnormal loss is charged to the Costing Profit and Loss Account. Rectification cost of defectives caused by the job's nature is charged to that job.

Key rules to remember

Overhead absorption rate
Rate = Budgeted overheads ÷ Budgeted base (labour hours, machine hours, direct wages etc.)
Use budgeted figures for the rate. Use actual base units of the job to absorb.
Overhead absorbed by a job
Overhead = Rate × Actual base units used by the job
For a percentage-of-wages rate: Rate % = Overheads ÷ Direct wages × 100.
Prime cost
Prime cost = Direct materials + Direct labour + Direct expenses
Direct expenses chargeable to a job, such as a special tool or hire, are added here.
Total cost of a job
Total cost = Prime cost + Factory overhead + Administration and other overheads (as given)
Apply each overhead on the base stated in the question, such as factory cost or prime cost.
Price with profit on cost
Price = Total cost × (1 + Profit %)
Profit on cost of 25% means profit is 25% of cost.
Price with profit on sales
Price = Total cost ÷ (1 − Profit % on sales)
Profit on sales of 20% means cost is 80% of price.
Converting profit percentages
Profit on sales % = Profit on cost % ÷ (100 + Profit on cost %) × 100
25% on cost equals 20% on sales. 20% on cost equals 16⅔% on sales.
Cost per good unit with normal spoilage
Cost per good unit = (Total cost − Scrap value of normal spoilage) ÷ Good units
Abnormal loss is valued at cost per unit started less its scrap value, and goes to Costing P&L, not to the job.

How to solve Job Costing Numericals: Pricing, Profit and Overheads questions

Use this order for any job costing numerical. It keeps your working clean and earns step marks.

  1. 1Read the question for the profit basis (on cost or on sales), the overhead base and whether the job is complete.
  2. 2Compute the overhead absorption rate if it is not given. Divide budgeted overheads by the budgeted base.
  3. 3List the job's materials, labour and direct expenses, and total them as prime cost. Work out labour as hours × rate.
  4. 4Add factory overhead using the rate and the job's actual base units. Then add administration or selling overheads on the stated base.
  5. 5Adjust for spoilage, defectives, scrap and WIP. Separate normal from abnormal. Charge normal to the job and abnormal to Costing P&L.
  6. 6Find total cost, then add profit using the correct basis to reach the price. Divide by units if a per-unit price is asked.
  7. 7Present a neat job cost statement with clear headings, and state the final answer with units and rupees.

Quickest way: Cost statement first, profit last

When to use it: Use this in the exam for both MCQs and long answers when time is short.

  1. For MCQs, convert profit first. If profit is on sales, multiply cost by 100 ÷ (100 − profit %). A 20% margin on sales means price = cost × 1.25. Eliminate options that equal cost × 1.20.
  2. Check the answer by computing profit ÷ price. It must equal the stated percentage on sales.
  3. For written answers, draw a two-column statement: particulars and amount. Show each rate and its working in brackets, such as 500 hrs × ₹30. Examiners award marks per line.
  4. Do the rate calculation separately at the top, so a slip in later lines does not lose the rate marks.
  5. Keep spoilage in a small side working: units, cost per unit, scrap value, normal or abnormal. Then bring only the final figure into the statement.

Common mistakes in Job Costing Numericals: Pricing, Profit and Overheads

  • Adding profit as a percentage of cost when the question says profit on sales.

    Students multiply cost by 1.20 out of habit.

    Fix: If profit is on sales, divide cost by (1 − profit %). Check afterwards that profit ÷ price gives the stated percentage.

  • Using the budgeted base units instead of the job's actual units to absorb overhead.

    The rate working and the absorption working get mixed up.

    Fix: Rate uses budgeted figures. Absorption = rate × the job's own hours, wages or machine hours.

  • Applying administration overhead on the wrong base.

    The base (factory cost, prime cost or sales) is skimmed over.

    Fix: Underline the base in the question. Factory cost means prime cost plus factory overhead.

  • Charging abnormal spoilage to the job.

    Students treat all spoilage alike.

    Fix: Normal spoilage cost, net of scrap, stays with the good units. Abnormal loss, net of scrap, goes to Costing Profit and Loss Account.

  • Carrying the full job cost to the next period for an incomplete job, or ignoring WIP.

    The period-end position is not read carefully.

    Fix: Value WIP at the cost incurred so far, including absorbed overhead to date. Cost of completed jobs goes to cost of goods sold.

  • Forgetting direct expenses or including a general overhead as a direct expense.

    Costs are not classified before totalling.

    Fix: Only costs identifiable with the job are direct expenses. Everything shared goes through the overhead rate.

Worked examples

Example 1

A firm quotes for Job No. 101. Direct materials are ₹40,000. Direct labour is 500 hours at ₹60 per hour. A special tool hired for the job costs ₹5,000. Budgeted factory overheads are ₹6,00,000 and budgeted direct labour hours are 20,000. Factory overheads are absorbed on direct labour hours. Administration overhead is 10% of factory cost. The firm wants a profit of 20% on sales. Find the quotation price.

Show the solution
  1. Factory overhead rate = ₹6,00,000 ÷ 20,000 hours = ₹30 per labour hour.
  2. Direct labour = 500 × ₹60 = ₹30,000.
  3. Prime cost = ₹40,000 + ₹30,000 + ₹5,000 = ₹75,000.
  4. Factory overhead = 500 × ₹30 = ₹15,000.
  5. Factory cost = ₹75,000 + ₹15,000 = ₹90,000.
  6. Administration overhead = 10% × ₹90,000 = ₹9,000.
  7. Total cost = ₹90,000 + ₹9,000 = ₹99,000.
  8. Profit is 20% on sales, so cost is 80% of price. Price = ₹99,000 ÷ 0.80 = ₹1,23,750.
  9. Check: profit = ₹1,23,750 − ₹99,000 = ₹24,750, which is 20% of ₹1,23,750.

Answer: Quotation price = ₹1,23,750 (total cost ₹99,000 and profit ₹24,750).

Example 2

Job No. 202 is an order for 200 units. To get 200 good units, 220 units were started. Costs of the job: materials ₹60,000, direct labour 1,000 hours at ₹30 per hour, and factory overhead at ₹20 per direct labour hour. Twenty units were spoilt. Ten of these are normal spoilage inherent in the job and ten are abnormal. Every spoilt unit can be sold as scrap for ₹100. Find (a) the cost charged to the job, (b) cost per good unit, (c) the loss charged to Costing Profit and Loss Account, and (d) the price per unit if profit is 25% on cost.

Show the solution
  1. Direct labour = 1,000 × ₹30 = ₹30,000. Factory overhead = 1,000 × ₹20 = ₹20,000.
  2. Total cost of 220 units = ₹60,000 + ₹30,000 + ₹20,000 = ₹1,10,000.
  3. Cost per unit started = ₹1,10,000 ÷ 220 = ₹500.
  4. Abnormal spoilage: 10 units × ₹500 = ₹5,000. Scrap realised = 10 × ₹100 = ₹1,000. Net loss to Costing P&L = ₹5,000 − ₹1,000 = ₹4,000.
  5. Cost left for the job after removing abnormal units = ₹1,10,000 − ₹5,000 = ₹1,05,000.
  6. Normal spoilage scrap = 10 × ₹100 = ₹1,000. Cost of the job = ₹1,05,000 − ₹1,000 = ₹1,04,000.
  7. Cost per good unit = ₹1,04,000 ÷ 200 = ₹520.
  8. Price with 25% profit on cost = ₹520 × 1.25 = ₹650 per unit. Total price = ₹1,30,000.
  9. Check by reconciling the total cost: job cost ₹1,04,000 + abnormal loss net ₹4,000 + scrap realised on all 20 spoilt units ₹2,000 (20 × ₹100) = ₹1,10,000, which equals the total cost of 220 units.
  10. Second check using cost per unit started: 200 × ₹500 = ₹1,00,000, plus normal spoilage ₹5,000 (10 × ₹500), less scrap ₹1,000 = ₹1,04,000. This relies on the ₹500 figure from step 3, so it confirms the arithmetic but is not an independent check.

Answer: (a) Cost of job ₹1,04,000; (b) ₹520 per good unit; (c) ₹4,000 to Costing P&L; (d) ₹650 per unit, or ₹1,30,000 for the job.

Exam tips

  • Always underline the profit basis. Examiners often switch between profit on cost and profit on sales in similar questions.
  • Show the overhead rate working separately and in full. It earns marks even if later steps go wrong.
  • For spoilage, state clearly whether it is normal or abnormal and where each part is charged. Do this in one line of text.
  • When a job is incomplete, state that only cost incurred so far is carried as WIP. Show WIP as a separate line.
  • In MCQs, test each option by reverse calculation. Take the price, remove the profit, and see if you get the cost.

Practice questions from Job Costing

Job Costing Numericals: Pricing, Profit and Overheads in other exams

The same ground in other exams, if you are preparing for more than one or want another angle on it.

Job Costing Numericals: Pricing, Profit and Overheads: frequently asked questions

How do I calculate the price of a job with profit on sales?

Find total cost first. Then divide it by (1 − profit % on sales). For a 20% margin, price = cost ÷ 0.80. This is the same as cost × 1.25.

How do I find the overhead absorption rate per labour hour?

Divide budgeted overheads by budgeted direct labour hours. Then multiply this rate by the actual hours worked on the job. For example, ₹6,00,000 ÷ 20,000 hours is ₹30 per hour.

How is spoilage treated in a job cost?

Normal spoilage cost, less any scrap value, is added to the cost of the good units of the job. Abnormal spoilage, less scrap value, is charged to the Costing Profit and Loss Account. Only the normal part raises the job cost.

Where can I practise job costing questions for CA Intermediate?

Solve the practical questions in the ICAI study material, RTPs, MTPs and past exam papers for Paper 4. Attempt them timed and write full cost statements. Compare your format and rate working with the suggested answers.