FRM Part II · FRM Exam Part II · Liquidity Transfer Pricing: A Guide to Better Practice
A bank grants a corporate client an undrawn committed credit line of 200 million. The treasury estimates that, in a stress scenario, 40% will be drawn within 30 days. The stressed 30-day funding spread over the base rate is 1.50% annualized, and the bank charges the business unit a contingent liquidity premium on the expected stressed draw. Which annual charge is consistent with this approach, ignoring any probability of the stress occurring?
The charge is 1.2 million. The stressed draw is 40% of 200 million, or 80 million, and funding that amount costs 1.50% annually, giving 1.2 million. Charging on the full commitment would overstate the cost, since only the expected drawn portion needs funding in stress.
- A3.0 million, being 200 million x 1.50%
- B1.2 million, being 80 million x 1.50%Correct
- C0.8 million, being 80 million x 1.00%
- D4.8 million, being 200 million x 40% x 6%
Explanation
Expected stressed draw is 200 x 40% = 80 million. Applying the 1.50% stressed spread gives 80 x 0.015 = 1.2 million. Charging on the full 200 million ignores the drawdown assumption, and the other options use unsupported rates.
Did you get it right without looking?
One question tells you little. A timed set on Liquidity Transfer Pricing: A Guide to Better Practice shows your real accuracy, how long you take and where you lose marks.
More Liquidity Transfer Pricing: A Guide to Better Practice questions
- A bank's treasury sets the funds transfer price for a 5-year fixed-rate loan using the matched-maturity funding curve of 4.00% and a liquidi…
- Which governance arrangement is most consistent with good practice for a bank's LTP framework?
- A bank uses a single pooled transfer rate equal to the weighted average cost of all funding for every asset and liability, regardless of ten…
- A bank's treasury wants a funds transfer pricing (FTP) framework in which business units are charged for the liquidity risk of the assets th…
- A bank's LTP framework prices contingent liquidity risk from off-balance-sheet commitments. Which design feature is most consistent with bet…
- A bank uses a single pooled average cost of funds as its transfer price for all assets and liabilities. Which problem is most directly assoc…