FRM Part II · FRM Exam Part II · Portfolio Credit Risk
A bank holds a USD 50 million loan with a 2% one-year default probability and 60% loss given default. It buys a one-year CDS covering the full notional from a protection seller with a 1% default probability. Assume the reference obligor and the seller defaults are independent, and that on a joint default the bank recovers nothing on the protection. Ignoring the CDS premium and timing, what is the bank's expected loss after hedging? Treat the loss as arising only if the obligor defaults and the seller also defaults (loss then 60% of notional).
Expected loss after hedging is USD 0.006 million. The bank loses only if both the obligor and the protection seller default, probability 2% times 1% equals 0.02%, applied to a loss of USD 30 million (60% of 50 million), which gives 0.006 million.
- AUSD 0.60 million
- BUSD 0.006 millionCorrect
- CUSD 0.012 million
- DUSD 0.30 million
Explanation
Joint default probability = 2% x 1% = 0.0002. Loss given joint default = 0.60 x 50m = 30m. Expected loss = 0.0002 x 30m = USD 0.006m. The unhedged expected loss is 0.02 x 30m = 0.6m, which is the first distractor. USD 0.012m uses 0.02 x 0.01 x 60m wrongly, doubling the exposure.
Did you get it right without looking?
One question tells you little. A timed set on Portfolio Credit Risk shows your real accuracy, how long you take and where you lose marks.
More Portfolio Credit Risk questions
- Two obligors each have a one-year default probability of 10%. The joint default probability is 3%. What is the default correlation between t…
- A bank uses a bilateral netting agreement with a derivatives counterparty. Which statement best describes the effect of enforceable netting …
- A bank's loan portfolio has a large exposure to a single regional energy producer, producing high name concentration. The credit risk manage…
- A bank holds a single loan with exposure at default of USD 10 million, a one-year probability of default of 2%, and loss given default of 40…
- Holding PD and confidence level fixed, a risk manager raises the asset correlation parameter in a Vasicek large homogeneous portfolio model …
- A bank's credit portfolio has an expected loss of USD 30 million. The 99.9% quantile of the portfolio loss distribution is USD 210 million. …