FRM Part I · FRM Exam Part I · The Building Blocks of Risk Management
A company hedges a USD 10 million commodity purchase with futures. The spot price changes have a standard deviation of 4% and futures price changes 5%, with correlation 0.8 between them. The futures contract size is USD 100,000 per contract at the current futures price, and the hedger uses the minimum-variance hedge ratio. How many contracts should be used, and what proportion of variance is eliminated?
Use 64 contracts, and 64% of variance is eliminated. The minimum-variance hedge ratio is 0.8 times 4% over 5%, which is 0.64, giving USD 6.4 million of futures at USD 100,000 each. Effectiveness is the squared correlation, 0.64, not the correlation itself.
- A80 contracts; 80% of variance eliminated
- B100 contracts; 64% of variance eliminated
- C64 contracts; 80% of variance eliminated
- D64 contracts; 64% of variance eliminatedCorrect
Explanation
h* = ρσS/σF = 0.8 × 4/5 = 0.64. Futures notional = 0.64 × 10m = USD 6.4m, so 64 contracts. Hedge effectiveness equals ρ² = 0.64, so 64% of variance is removed. The 80% figure confuses correlation with its square.
Did you get it right without looking?
One question tells you little. A timed set on The Building Blocks of Risk Management shows your real accuracy, how long you take and where you lose marks.
More The Building Blocks of Risk Management questions
- Which element is most characteristic of the 'three lines' structure within a risk management framework?
- A bank estimates that a loan portfolio has a one-year expected loss of USD 12 million. Over the same horizon, the 99.9% credit loss quantile…
- Which statement best explains why an insurance company can bear risks that individuals find difficult to bear?
- Two portfolios have the same Sharpe ratio, but Portfolio X has volatility of 10% and Portfolio Y has volatility of 20%. The risk-free rate i…
- Within a risk management framework, which feature most clearly distinguishes a risk limit from a risk appetite statement?
- A financial intermediary's role in risk transformation is best illustrated by which of the following activities?