FRM Part II · FRM Exam Part II · Liquidity Risk Management
A fund manager estimates a portfolio's 1-day 99% VaR at USD 10 million using mid-prices. The portfolio's positions have a mean bid-ask spread of 0.40% of value and a spread standard deviation of 0.10%, with a spread-risk scaling factor of 3 on the standard deviation. The portfolio value is USD 500 million. Using the exogenous-spread (constant plus random) liquidity-adjusted VaR approach, what is the liquidity cost to add, assuming the cost is 0.5 x portfolio value x (mean spread + k x spread standard deviation)?
The liquidity cost is USD 1.75 million. The worst-case spread is 0.40% plus three times 0.10%, or 0.70%. Half of that spread applied to the USD 500 million portfolio gives 1.75 million, which is added to the mid-price VaR to obtain liquidity-adjusted VaR.
- AUSD 0.50 million
- BUSD 1.75 millionCorrect
- CUSD 3.50 million
- DUSD 7.00 million
Explanation
Mean spread plus 3 standard deviations = 0.40% + 0.30% = 0.70%. Cost = 0.5 x 500 million x 0.70% = USD 1.75 million. Using only the mean spread gives 1.00 million; omitting the 0.5 half-spread factor gives 3.50 million. Neither fits the stated formula.
Did you get it right without looking?
One question tells you little. A timed set on Liquidity Risk Management shows your real accuracy, how long you take and where you lose marks.
More Liquidity Risk Management questions
- A contingency funding plan (CFP) for a bank is being redesigned. Which feature best reflects sound practice?
- A bank's liquidity coverage ratio (LCR) is designed to ensure that it can withstand a specific stress scenario. Which description of the LCR…
- A bank's liquidity stress test assumes a severe combined market and idiosyncratic scenario. Which design feature would most undermine the us…
- A bank has liquid assets of 900 after applying haircuts. In a 30-day stress, it expects run-off of 1,000 retail deposits at 10%, 2,000 unsec…
- A bank's treasurer notes that the bank can no longer roll over its maturing wholesale certificates of deposit at acceptable cost, even thoug…
- A risk manager adds a liquidity adjustment to a position's 99% one-day VaR using the exogenous-spread approach. Which quantity is added to m…