A job costing system differs from batch costing mainly because in job costing:
Job costing costs each job separately, normally produced to a particular customer's specification. Batch costing instead treats a group of identical units as a single cost unit. Continuous averaging applies to process costing, so the first option is correct.
- AEach job is usually executed to a customer's specific order and costed separatelyCorrect
- BEach job always consists of many identical units
- CCosts are averaged over a continuous production flow
- DCosts are never traced to cost units
Explanation
Job costing accumulates costs for a specific customer order, which is distinct. Batch costing groups identical units into one cost unit. Continuous flow averaging belongs to process costing.
Did you get it right without looking?
One question tells you little. A timed set on Unit & Batch Costing shows your real accuracy, how long you take and where you lose marks.
More Unit & Batch Costing questions
- Which statement about batch costing is correct?
- Sundaram Cement Works produced 20,000 tonnes in a quarter. Costs were: raw materials ₹12,00,000; direct wages ₹4,00,000; factory overheads ₹…
- In a batch costing system, the Economic Batch Quantity (EBQ) is the batch size at which the total of two costs is minimised. Which pair of c…
- In batch costing, the Economic Batch Quantity (EBQ) is the batch size at which the sum of which two costs is minimised?
- In batch costing, the Economic Batch Quantity (EBQ) is the batch size at which the total of which two costs is minimised?
- Meera Toys Ltd. produces a batch of 500 units. Direct materials are ₹60,000 and direct wages ₹40,000. Factory overhead is absorbed at 150% o…