Skip to content

FRM Part II · FRM Exam Part II · Credit Scoring and Retail Credit Risk Management

A lender's mortgage scorecard assigns a 12-month PD of 2.0% to a score band. Over the past year 2,000 loans were in that band and 60 defaulted. Using a one-sided binomial test at about 95% confidence (z = 1.645) with the normal approximation, which conclusion is correct?

The observed default rate of 3.0% is significantly higher than the predicted 2.0%. Expected defaults are 40 with a standard deviation of about 6.26, giving z of roughly 3.19, above 1.645. The binomial test rejects the calibration, so the model underestimates PD.

  1. AThe observed rate of 3.0% is not significantly above 2.0%; the PD is acceptable
  2. BThe observed rate of 3.0% is significantly above 2.0% since the test statistic is about 3.2, so PD is underestimatedCorrect
  3. CThe observed rate of 3.0% is significantly below 2.0%, so PD is overestimated
  4. DThe test statistic is about 1.6, which is just below the critical value, so no conclusion can be drawn

Explanation

Expected defaults = 2,000 × 2% = 40. Standard deviation = sqrt(2000 × 0.02 × 0.98) = sqrt(39.2) = 6.26. z = (60 − 40)/6.26 = 3.19, well above 1.645. The calibration is rejected, indicating PD underestimation. The 1.6 option wrongly uses the standard deviation of 12.5 or mishandles the variance.

Did you get it right without looking?

One question tells you little. A timed set on Credit Scoring and Retail Credit Risk Management shows your real accuracy, how long you take and where you lose marks.

More Credit Scoring and Retail Credit Risk Management questions