Skip to content

FRM Part I · FRM Exam Part I · Futures Markets

A manager has a USD 100 million equity portfolio with a beta of 0.80. The index futures price is 5,000 with a multiplier of USD 50 per point, so each contract is worth USD 250,000. The manager wants to raise the portfolio beta to 1.40 using futures. What position should the manager take?

The manager should go long 240 contracts. The beta must rise by 0.60, so the required notional is 0.60 x USD 100 million = USD 60 million. Dividing by the USD 250,000 contract value gives 240 long contracts. Going long adds market exposure, which increases beta.

  1. AShort 240 contracts
  2. BLong 240 contractsCorrect
  3. CLong 400 contracts
  4. DLong 560 contracts

Explanation

To raise beta, go long. Contracts = (target beta - current beta) x portfolio value / contract value = (1.40 - 0.80) x 100,000,000 / 250,000 = 0.60 x 400 = 240 long. Long 400 would use a beta change of 1.0, and long 560 would use the sum of the betas (2.2 would give 880; 1.40 alone gives 560), ignoring the existing 0.80 beta.

Did you get it right without looking?

One question tells you little. A timed set on Futures Markets shows your real accuracy, how long you take and where you lose marks.

More Futures Markets questions