Skip to content

FRM Part I · FRM Exam Part I · Interest Rate Futures

A portfolio has a DV01 of $42,000 per basis point. A bond futures contract has a DV01 of $70 per contract. Historical analysis shows the portfolio's yield changes by 1.2 basis points for each 1 basis point change in the futures' underlying yield (yield beta = 1.2). How many futures contracts should be shorted to hedge using the yield-beta-adjusted DV01 approach?

Short 720 contracts. The DV01 ratio of 42,000 over 70 gives 600 contracts, and since the portfolio yield moves 1.2 times as much as the futures yield, the position must be scaled up by 1.2. That produces 720 contracts.

  1. A720Correct
  2. B600
  3. C500
  4. D864

Explanation

Unadjusted ratio = 42,000 / 70 = 600. Because the portfolio yield moves 1.2 times as much as the futures yield, the hedge needs 600 x 1.2 = 720 contracts. 600 ignores beta, 500 divides by beta instead of multiplying, and 864 applies the beta twice (720 x 1.2).

Did you get it right without looking?

One question tells you little. A timed set on Interest Rate Futures shows your real accuracy, how long you take and where you lose marks.

More Interest Rate Futures questions