FRM Part I · FRM Exam Part I · Modeling Non-Parallel Term Structure Shifts and Hedging
A portfolio has a market value of $5,000,000 and a modified duration of 6.2. What is the portfolio's approximate DV01?
The DV01 is about $3,100. It equals market value times modified duration times one basis point: 5,000,000 × 6.2 × 0.0001. Larger figures come from using a 10 bp or 100 bp yield move instead of a single basis point.
- A$310
- B$3,100Correct
- C$31,000
- D$310,000
Explanation
DV01 is the dollar price change for a one basis point (0.0001) yield change: 5,000,000 × 6.2 × 0.0001 = $3,100. $31,000 uses 0.001 instead of 0.0001. $310,000 is the loss for a 100 bp move, not 1 bp.
Did you get it right without looking?
One question tells you little. A timed set on Modeling Non-Parallel Term Structure Shifts and Hedging shows your real accuracy, how long you take and where you lose marks.
More Modeling Non-Parallel Term Structure Shifts and Hedging questions
- A trader wants a DV01-neutral curve steepener: short $10 million face of a 10-year bond with DV01 of $0.085 per $100 face, and long a 2-year…
- A portfolio's daily P&L has a standard deviation of $200,000. A hedge instrument's daily P&L has a standard deviation of $150,000, and the c…
- Key rates are set at 2, 5 and 10 years. A key rate shift is applied in which the 5-year rate rises by 10 bp, the 2-year and 10-year rates ar…
- A fund holds bonds with a DV01 of $12,000 per basis point, concentrated around the 7-year point. A 7-year interest rate swap has a DV01 of $…
- A PCA of yield curve changes yields eigenvalues (variances of the components) of 12.0, 4.0, 1.5 and 0.5 for the first four principal compone…
- A $20 million portfolio has key rate durations of 0.5 at the 2-year, 2.0 at the 5-year and 3.5 at the 10-year points. The 2-year key rate ri…