Skip to content

FRM Part II · FRM Exam Part II · Portfolio Construction

A portfolio manager builds a long-only portfolio with a benchmark weight of 4% in a stock. The manager's active weight is +1.5%. The stock's factor exposure (z-score) is 0.8 and the portfolio's benchmark-relative exposure to the factor is measured as the sum of active weight times z-score. The only other active positions are a +0.5% weight with z-score 1.2 and a -2.0% weight with z-score -0.5. What is the portfolio's active factor exposure?

Active factor exposure is the sum of active weight times z-score: 1.5×0.8 is 1.20, 0.5×1.2 is 0.60, and the underweight of -2.0 on a stock with z-score -0.5 contributes +1.00. The total is 2.80, showing the underweight adds to the tilt.

  1. A2.80Correct
  2. B2.40
  3. C2.80 percentage-point units is wrong; the answer is 1.20
  4. D2.80 is wrong; the answer is 3.20

Explanation

Active exposure = 1.5×0.8 + 0.5×1.2 + (-2.0)×(-0.5) = 1.20 + 0.60 + 1.00 = 2.80. Ignoring the sign on the short active position gives 1.80 less 1.00 = 0.80, and omitting it gives 1.80, so the signed sum is needed.

Did you get it right without looking?

One question tells you little. A timed set on Portfolio Construction shows your real accuracy, how long you take and where you lose marks.

More Portfolio Construction questions