FRM Part I · FRM Exam Part I · Simulation and Bootstrapping
A risk analyst estimates the price of a European call by Monte Carlo simulation. For each random draw Z, she also uses -Z to generate a second price path, and averages the two payoffs for that pair. Which variance reduction technique is this, and what condition makes it effective?
This is antithetic variates. Each draw Z is paired with -Z, and the pair average has variance σ²(1+ρ)/2, so variance falls only when the two payoffs are negatively correlated. Control variates would need a variable with a known expected value.
- AAntithetic variates; the payoffs from Z and -Z must be negatively correlatedCorrect
- BControl variates; the payoff must be correlated with a variable having a known expected value
- CImportance sampling; the draws must be concentrated in the tail region
- DStratified sampling; the draws must be split into equal-probability intervals
Explanation
Pairing each draw Z with -Z is the antithetic variates method. The variance of the pair average is (1/2)σ²(1+ρ), so it falls only if the correlation ρ between the two payoffs is negative. Control variates use a correlated variable with known mean, which is not described here.
Did you get it right without looking?
One question tells you little. A timed set on Simulation and Bootstrapping shows your real accuracy, how long you take and where you lose marks.
More Simulation and Bootstrapping questions
- A risk analyst estimates the price of a derivative by running 10,000 independent Monte Carlo trials and obtains a standard error of 0.40. Sh…
- A Monte Carlo simulation estimates the price of an option, with a standard error of 0.40 using 10,000 independent trials. The desk wants the…
- A risk manager simulates the one-year payoff of a position using 400 independent trials. The sample mean payoff is USD 5.0 million and the s…
- A bank estimates the 99% VaR of a portfolio by Monte Carlo simulation. Which statement about sampling error in this estimate is most accurat…
- Which statement best describes a limitation shared by both Monte Carlo simulation and bootstrapping when used for risk estimation?
- A risk team estimates the price of an option by Monte Carlo simulation with N independent draws, obtaining a sample standard deviation of di…