FRM Part II · FRM Exam Part II · Arbitrage Pricing with Term Structure Models
A risk manager compares the long-horizon rate volatility in Ho-Lee (σ = 1.00%) and Vasicek (σ = 1.00%, k = 0.50). As the horizon T becomes very large, which description is correct?
Ho-Lee has no mean reversion, so its variance σ²T grows without limit. Vasicek's mean reversion bounds variance at σ²/(2k), which equals 0.0001 here. Hence only the first description is correct.
- AHo-Lee short-rate variance grows without bound, while Vasicek variance approaches σ²/(2k) = 0.01%Correct
- BBoth variances grow without bound, but Vasicek grows more slowly
- CBoth variances converge to a finite limit, with Vasicek's the larger
- DHo-Lee variance converges to σ²/(2k) while Vasicek variance grows linearly
Explanation
Ho-Lee variance is σ²T, which is unbounded. Vasicek variance is σ²(1 − e^(−2kT))/(2k), which tends to σ²/(2k) = 0.0001/(1.0) = 0.0001, i.e. 0.01% in variance (standard deviation 1%). Mean reversion therefore bounds the variance, so the option claiming unbounded growth in both is wrong.
Did you get it right without looking?
One question tells you little. A timed set on Arbitrage Pricing with Term Structure Models shows your real accuracy, how long you take and where you lose marks.
More Arbitrage Pricing with Term Structure Models questions
- A risky asset trades at 50 today and will be worth either 60 or 40 in one year. The riskless rate is 5% per year. A derivative pays 20 if th…
- A risk analyst models the one-year short rate with a binomial tree. The current one-year rate is 5%. One year from now the one-year rate wil…
- A risk manager prices bonds on a calibrated binomial tree using risk-neutral probabilities of 0.5. A research team then argues that the real…
- A risk manager prices an option on a bond using a one-period binomial tree and a replicating portfolio. A colleague argues the price should …
- In a one-period binomial interest rate tree, a risk analyst states that the risk-neutral probability of an up move is 0.5 although the true …
- The current one-year rate is 5%. In one year the one-year rate will be 6% (up) or 4% (down), each with risk-neutral probability 0.5. A Europ…