CMA Intermediate · Cost Accounting · Overheads
A workshop at Coimbatore budgets factory overheads of Rs 6,00,000 for the year and expects 1,20,000 direct labour hours. Using a direct labour hour rate, how much overhead will be absorbed by a job that consumes 150 direct labour hours?
The overhead absorbed is Rs 750. The predetermined direct labour hour rate is budgeted overhead of Rs 6,00,000 divided by 1,20,000 budgeted hours, which is Rs 5 per hour, and multiplying this by the job's 150 hours gives the absorbed overhead.
- ARs 600
- BRs 750Correct
- CRs 4,000
- DRs 7,500
Explanation
Predetermined rate = 6,00,000 / 1,20,000 = Rs 5 per direct labour hour. Overhead absorbed by the job = 150 x 5 = Rs 750. Rs 7,500 results from wrongly using a rate of Rs 50, and Rs 4,000 comes from dividing hours into overhead incorrectly.
Did you get it right without looking?
One question tells you little. A timed set on Overheads shows your real accuracy, how long you take and where you lose marks.
More Overheads questions
- Which one of the following overhead items is controllable by the head of a production department in the short run?
- A factory building houses several production departments. Which basis is the most appropriate for apportioning the rent of the building to t…
- Under CAS 3 (Overheads), which approach is stated for treatment of under-absorbed or over-absorbed overheads arising from normal causes?
- Mehta Engineering uses a numeric code where the first digit shows the nature of expense (3 = indirect expense), the second and third digits …
- Under CAS 3 (Production and Operation Overheads), how should the cost of a service department used by several production departments be hand…
- Mehta Auto Ltd. has production departments A and B and service departments S1 and S2. Primary overheads: A Rs 2,00,000; B Rs 1,50,000; S1 Rs…