Skip to content

FRM Part I · FRM Exam Part I · Linear Regression

An analyst wants to include a categorical variable with four credit-rating buckets (AAA/AA, A, BBB, BB) in a regression that also has an intercept. Which specification avoids perfect multicollinearity and allows each bucket's effect to be measured?

Use three dummy variables with the intercept, letting the omitted bucket be the base category. Including all four dummies alongside an intercept creates perfect multicollinearity because they sum to the constant column. Numeric coding 1-4 would wrongly impose equal effects between adjacent buckets.

  1. AFour dummy variables, one per bucket, plus the intercept
  2. BOne variable coded 1, 2, 3, 4 for the buckets, with no dummies
  3. CThree dummy variables, with the omitted bucket serving as the base captured by the interceptCorrect
  4. DTwo dummy variables, merging the four buckets into two groups

Explanation

With an intercept, k categories need k-1 dummies; including all four makes their sum equal the intercept column, causing the dummy variable trap. Coding 1-4 imposes equal spacing between buckets, and merging two dummies loses the separate bucket effects.

Did you get it right without looking?

One question tells you little. A timed set on Linear Regression shows your real accuracy, how long you take and where you lose marks.

More Linear Regression questions