FRM Part I · FRM Exam Part I · Stationary Time Series

An AR(1) model has intercept 1.0 and coefficient 0.5. The latest observation is y_T = 4. What is the two-step-ahead forecast of y_{T+2}?

The two-step forecast is 2.5. Iterating the model, the one-step forecast is 1 + 0.5 times 4, which is 3.0, and the next step gives 1 + 0.5 times 3.0, which is 2.5. The forecast moves toward the unconditional mean of 2.

  1. A2.5
  2. B3.0
  3. C3.5Correct
  4. D4.0

Explanation

One step: 1 + 0.5(4) = 3.0. Two steps: 1 + 0.5(3.0) = 2.5. Wait, check: 1 + 1.5 = 2.5, so the correct value is 2.5 and the key matches option index 0.