FRM Part II · FRM Exam Part II · Portfolio Construction
Equilibrium excess returns are 4% for Asset X and 6% for Asset Y. A simplified Bayesian update blends a prior mean of 6% for Asset Y (prior variance 0.0004) with a single view of 10% for Asset Y (view variance 0.0004). What is the posterior expected excess return for Asset Y?
The posterior expected return is 8%. With equal prior and view variances the precisions are identical, so the Bayesian update is a simple 50/50 average of the 6% prior and the 10% view. Ignoring either source would give 6% or 10%.
- A6%
- B8%Correct
- C10%
- D7%
Explanation
Posterior mean is the precision-weighted average. Precisions are 1/0.0004 for both, so the weights are equal: 0.5*6% + 0.5*10% = 8%. Choosing 6% ignores the view and 10% ignores the prior.
Did you get it right without looking?
One question tells you little. A timed set on Portfolio Construction shows your real accuracy, how long you take and where you lose marks.
More Portfolio Construction questions
- Under the basic Fundamental Law of Active Management, IR = IC x sqrt(BR). An analyst has an information coefficient of 0.05 and makes indepe…
- A portfolio manager uses mean-variance optimization with historical returns for 40 assets and obtains a portfolio with extreme long and shor…
- A risk manager imposes a no-short-sales constraint on a mean-variance optimization. Relative to the unconstrained solution, which statement …
- A pension fund wants to replace a market-cap-weighted equity allocation with a rules-based smart beta strategy that tilts toward stocks with…
- A manager's portfolio has a beta of 1.2 against the market. Over the year the portfolio returned 14%, the risk-free rate was 3%, and the mar…
- A pension fund replaces a capitalization-weighted equity index allocation with a single-factor smart beta product that weights stocks by the…