CA Intermediate · Cost and Management Accounting · Standard Costing
In a standard costing system, the fixed overhead volume variance arises because of the difference between:
Fixed overhead volume variance is the difference between fixed overheads absorbed on actual output at the standard rate and the budgeted fixed overheads. It reflects over- or under-absorption because production volume differed from the budget, unlike the expenditure variance, which compares budgeted and actual spending.
- ABudgeted fixed overheads and actual fixed overheads
- BAbsorbed fixed overheads (standard rate x actual output) and budgeted fixed overheadsCorrect
- CActual fixed overheads and absorbed fixed overheads based on actual hours
- DStandard hours for actual output and actual hours worked, at the standard rate
Explanation
Fixed overhead volume variance = absorbed overhead (standard rate x actual output) minus budgeted overhead. It shows under- or over-absorption caused by output differing from budget. Option A is the expenditure variance. Option D is the efficiency variance component.
Did you get it right without looking?
One question tells you little. A timed set on Standard Costing shows your real accuracy, how long you take and where you lose marks.
More Standard Costing questions
- Standard labour cost for a unit of product at Kaveri Engineering is 5 hours at Rs 80 per hour. In a month, 1,000 units were produced. Actual…
- Standard variable overhead is Rs 12 per hour. For actual output, 4,000 standard hours were allowed. Actual hours worked were 4,200 and actua…
- Mehta Chemicals uses a standard mix of 60 kg of X at Rs 40/kg and 40 kg of Y at Rs 50/kg to produce 90 kg of output. Actual input for the pe…
- Kaveri Plastics set a standard of 4 kg of resin per unit of output at Rs 50 per kg. In March it produced 1,000 units, using 4,200 kg of resi…
- Anand Chemicals uses a standard mix of A:B = 3:2 for 100 kg input giving 90 kg output. Standard prices: A Rs 40 per kg, B Rs 60 per kg. Actu…
- Which one of the following is the correct formula for the Material Usage (Quantity) Variance under standard costing?