Skip to content

CA Intermediate · Cost and Management Accounting · Cost Accounting Systems

In an integrated accounting system, when raw materials costing ₹80,000 are issued to production, of which ₹5,000 is indirect material, the correct entry is:

Debit Work-in-Progress Control ₹75,000 and Factory Overhead Control ₹5,000, and credit Stores Control ₹80,000. Direct material goes to WIP, indirect material to overhead, and stores fall by the total issue. No cost ledger control account is used in an integrated system.

  1. AWork-in-Progress Control A/c Dr ₹80,000 to Stores Control A/c ₹80,000
  2. BWork-in-Progress Control A/c Dr ₹75,000 and Factory Overhead Control A/c Dr ₹5,000 to Stores Control A/c ₹80,000Correct
  3. CWork-in-Progress Control A/c Dr ₹75,000 and Factory Overhead Control A/c Dr ₹5,000 to Cost Ledger Control A/c ₹80,000
  4. DStores Control A/c Dr ₹80,000 to Work-in-Progress Control A/c ₹75,000 and Factory Overhead Control A/c ₹5,000

Explanation

Direct material ₹75,000 is charged to WIP and indirect material ₹5,000 to overhead control, crediting Stores Control with ₹80,000. Option 1 wrongly puts indirect material in WIP. Option 3 uses a Cost Ledger Control account, which exists only in non-integrated systems. Option 4 reverses the entry.

Did you get it right without looking?

One question tells you little. A timed set on Cost Accounting Systems shows your real accuracy, how long you take and where you lose marks.

More Cost Accounting Systems questions