In batch costing, the cost per unit of a completed batch is found by:
The unit cost of a batch is the total cost accumulated for that batch divided by the number of units produced in it, because a batch is costed like a single job and its cost is spread across its output.
- ADividing total batch cost by the number of units produced in the batchCorrect
- BDividing total batch cost by the number of batches in the year
- CMultiplying the batch cost by the number of units
- DDividing the set-up cost alone by batch size
Explanation
A batch is treated as a single job, so all material, labour and overhead of the batch are accumulated. The total is then divided by the good output units of that batch to obtain unit cost.
Did you get it right without looking?
One question tells you little. A timed set on Job Costing shows your real accuracy, how long you take and where you lose marks.
More Job Costing questions
- Which industry is the LEAST suitable for the application of job costing?
- Job No. 41 of Kaveri Engineers used direct materials of ₹24,000 and direct wages of ₹16,000. Factory overhead is absorbed at 150% of direct …
- In job costing, the cost of normal spoilage that arises because of the specific requirements of a particular job is generally treated as:
- In batch costing, the Economic Batch Quantity (EBQ) is the batch size that:
- Job 7 of Sundaram Tools: material Rs 60,000, labour Rs 30,000, overheads Rs 30,000, for 100 units. Inspection finds 10 abnormal spoiled unit…
- In a job costing system, which document is normally prepared first for each job and is used to accumulate the material, labour and overhead …