FRM Part II · FRM Exam Part II · The Art of Term Structure Models: Drift
In the Ho-Lee model with constant σ, the drift is calibrated to the forward curve. Let F(t) be the instantaneous forward rate. The drift is λ(t) = ∂F(t)/∂t + σ²t. At t = 5, the forward curve has slope 0.20% per year and σ = 1.00% per year (0.01). What is λ(5)?
λ(5) is 0.25% per year. The drift equals the forward-rate slope plus the convexity term σ²t. With σ = 1% the convexity term is 0.0001 × 5 = 0.05%, so 0.20% + 0.05% = 0.25%. Ignoring convexity would give 0.20%.
- A0.25% per yearCorrect
- B0.20% per year
- C0.70% per year
- D0.45% per year
Explanation
σ²t = 0.0001 × 5 = 0.0005 = 0.05%. Adding the forward slope gives 0.20% + 0.05% = 0.25% per year. The 0.20% answer omits the convexity term, 0.70% uses σ·t, and 0.45% subtracts nothing but misapplies the term.
Did you get it right without looking?
One question tells you little. A timed set on The Art of Term Structure Models: Drift shows your real accuracy, how long you take and where you lose marks.
More The Art of Term Structure Models: Drift questions
- A desk uses a lognormal short-rate model, dr = a·r·dt + σ·r·dw, with σ = 20%. At a short rate of 5% the annual basis-point volatility is 100…
- In Model 1 with r_0 = 3.00% and σ = 80 bps per year, a risk manager wants the 5%-tail (one-sided) short-rate level in 1 year, using a z-valu…
- In Model 1 of Tuckman's term structure treatment, the short rate follows dr = σ dw with constant σ and no drift. A risk analyst states a pro…
- In a Vasicek model, k = 0.25, σ = 1.2% per year. What is the standard deviation of the short rate at a very long horizon (approximately)?
- A risk analyst compares two one-factor short-rate models calibrated to the same current term structure. Model A (Ho-Lee) has dr = λ(t)dt + σ…
- A risk manager is calibrating a CIR model with k = 0.25 and long-run mean θ = 4%. The risk premium term is λ√r, and the risk-neutral process…