In the London Whale case, the modified model computed a hazard-rate-style correlation measure using a spreadsheet in which an error arose from dividing by a sum rather than an average. What was the practical consequence of this error?

The spreadsheet error divided by a sum instead of an average, which understated volatility, in some calculations roughly by half, and so lowered VaR. The portfolio therefore looked less risky than it was, which shows how an unchecked manual calculation can produce material model risk.

  1. AVolatility was overstated, which raised VaR and triggered limit breaches
  2. BVolatility was understated, roughly halving the estimated volatility in some calculations and lowering VaRCorrect
  3. CCorrelations were set to 1 for all tranches, which raised capital requirements
  4. DThe error affected only reporting formatting and had no effect on risk numbers

Explanation

The spreadsheet divided by a sum instead of an average when computing rate changes, which understated volatility and hence the VaR. Dividing by a sum (about twice the average for two observations) shrinks the volatility estimate, making the portfolio look less risky.