IAI Actuarial Core Principles · Economic Modelling · Valuing benefit guarantees using simulation
In valuing a put-type guarantee, an actuary uses antithetic variates by pairing each stream of standard normal draws Z with -Z. Which statement best describes when this technique reduces the variance of the estimator?
Antithetic variates reduce variance when the payoff is monotonic in the random draws, because the payoffs from Z and -Z are then negatively correlated and the average of each pair has lower variance than two independent draws.
- AWhen the payoff is independent of the normal draws
- BWhen the payoff is a monotonic function of the draws, so the paired payoffs are negatively correlatedCorrect
- CWhen the payoff is a symmetric function of Z, so the paired payoffs are identical
- DWhen the number of simulations is increased to infinity only
- When the draws are replaced by deterministic constants
Explanation
The averaged pair has variance (sigma^2/2)(1+rho). Variance falls when rho is negative, which occurs when the payoff is monotonic in Z. A symmetric payoff gives rho=1, so no gain, which rules out option C.
Did you get it right without looking?
One question tells you little. A timed set on Valuing benefit guarantees using simulation shows your real accuracy, how long you take and where you lose marks.
More Valuing benefit guarantees using simulation questions
- An insurer has hedged a guarantee with delta hedging and wants to reduce the residual risk from changes in the volatility assumption. Which …
- An insurer values a maturity guarantee on a unit-linked policy by Monte Carlo simulation and estimates the guarantee cost as the sample mean…
- Which technique reduces the variance of a Monte Carlo guarantee cost estimate without increasing the number of simulations?
- An insurer values a maturity guarantee of Rs 10,00,000 using 10,000 simulated fund paths. At maturity, the fund value is below Rs 10,00,000 …
- When generating a standard normal variate from a uniform random number U on (0,1) by the inverse transform method, which is the correct proc…
- Which statement about a guarantee-cost estimate from Monte Carlo simulation is correct?