CMA Intermediate · Cost Accounting · Cost Book-Keeping
Kapoor Engineering uses a non-integral system. Cost ledger data: Opening WIP Rs 1,20,000; materials issued to production Rs 4,00,000; direct wages Rs 2,50,000; factory overhead absorbed at 80% of direct wages; closing WIP Rs 1,70,000. Finished goods are transferred at cost to the finished goods account. What amount is debited to Finished Goods Control A/c?
Overhead absorbed is 80% of Rs 2,50,000, which is Rs 2,00,000. WIP debits total Rs 9,70,000 including opening WIP, materials, wages and overhead. Deducting closing WIP of Rs 1,70,000 leaves Rs 8,00,000 as the cost of goods transferred to Finished Goods Control Account.
- ARs 8,00,000
- BRs 8,50,000
- CRs 8,20,000Correct
- DRs 8,70,000
Explanation
Overhead absorbed = 80% of 2,50,000 = 2,00,000. Total debits to WIP = 1,20,000 + 4,00,000 + 2,50,000 + 2,00,000 = 9,70,000. Less closing WIP 1,70,000 gives 8,00,000 transferred. Check: 8,00,000 + 1,70,000 = 9,70,000. Hence the correct figure is Rs 8,00,000, which is option A, not the others.
Did you get it right without looking?
One question tells you little. A timed set on Cost Book-Keeping shows your real accuracy, how long you take and where you lose marks.
More Cost Book-Keeping questions
- Under a non-integral system, Sharma Tools Ltd maintains a Cost Ledger Control Account. When raw materials worth Rs 2,40,000 are purchased an…
- Verma Engineering maintains non-integrated cost accounts. Opening balances: Stores Rs 80,000; WIP Rs 1,10,000; Finished Goods Rs 60,000. Dur…
- Gupta Industries had these cost ledger figures: opening WIP Rs 40,000, direct materials Rs 3,00,000, direct wages Rs 1,50,000, factory overh…
- Administration overheads of ₹90,000 are incurred in a month, and the firm absorbs them into cost of finished goods at 10% of factory cost. F…
- Gupta Industries uses non-integrated accounts. Factory overheads incurred during the period were Rs 4,60,000. Overheads absorbed into produc…
- Under non-integrated cost book-keeping, Sharma Components Ltd issued direct materials of Rs 1,20,000 and indirect materials of Rs 18,000 fro…