Sharma Fabricators incurred the following for Job 52: royalty on the patented design Rs 18,000 (Rs 6 per unit on 3,000 units produced), special drawings fee Rs 7,000, and hire of a crane for the job Rs 5,000. Factory power of Rs 40,000 was shared by all jobs, of which Rs 4,000 was allocated to Job 52 by a machine-hour basis. What are the direct expenses of Job 52?
Direct expenses of Job 52 are Rs 30,000, being royalty Rs 18,000, drawings fee Rs 7,000 and crane hire Rs 5,000. The Rs 4,000 of power is an apportioned share of a common cost, so it is overhead and excluded.
- ARs 34,000
- BRs 30,000Correct
- CRs 35,000
- DRs 70,000
Explanation
Direct expenses = royalty 18,000 + drawings 7,000 + crane hire 5,000 = Rs 30,000. The power share of Rs 4,000 is apportioned overhead, not direct; adding it gives Rs 34,000, which is wrong. Rs 70,000 mixes in total power and others.
Did you get it right without looking?
One question tells you little. A timed set on Direct Expenses shows your real accuracy, how long you take and where you lose marks.
More Direct Expenses questions
- Which of these is NOT normally classified as a direct expense?
- In a cost sheet prepared under CAS 10 (Direct Expenses), which of the following items would be treated as a direct expense of a specific job…
- Sharma Engineering pays a royalty of Rs 8 per unit produced to a patent holder for a patented process. In a month, 5,000 units were produced…
- A firm's cost sheet shows royalty on sales at Rs 4 per unit sold and royalty on production at Rs 3 per unit produced. Production was 10,000 …
- Verma Industries produced 8,000 units. Royalty is Rs. 6 per unit sold; 7,200 units were sold. Subcontracted job-specific processing cost was…
- Royalty paid to a patent holder on the basis of units produced of a particular product, and the cost of a special drawing made for a specifi…