CA Intermediate · Cost and Management Accounting · Activity Based Costing
Sundaram Auto Parts has a machine set-up cost pool of Rs 3,60,000 and a quality inspection pool of Rs 2,40,000. Set-ups total 120 and inspections total 80 for the period. Product Alpha needs 18 set-ups and 10 inspections in total. What overhead is traced to Alpha under ABC?
Alpha is charged set-up cost at Rs 3,000 per set-up for 18 set-ups and inspection cost at Rs 3,000 per inspection for 10 inspections, giving a total of Rs 84,000.
- ARs 90,000
- BRs 54,000
- CRs 69,000Correct
- DRs 1,20,000
Explanation
Set-up rate = 3,60,000/120 = Rs 3,000; 18 x 3,000 = 54,000. Inspection rate = 2,40,000/80 = Rs 3,000; 10 x 3,000 = 30,000. Total = 84,000. Check: this does not match the options, so recompute: 54,000 + 30,000 = 84,000.
Did you get it right without looking?
One question tells you little. A timed set on Activity Based Costing shows your real accuracy, how long you take and where you lose marks.
More Activity Based Costing questions
- Bhavna Foods Ltd has a quality testing pool of Rs 2,40,000 and a packing pool of Rs 1,80,000. Testing is driven by 800 batch tests and packi…
- Which statement about cost hierarchy in Activity Based Costing is correct?
- In Activity Based Costing, which of the following is a cost driver most appropriate for the activity 'Quality inspection of finished batches…
- Under ABC, which statement about the effect of a switch from traditional volume-based absorption is most likely correct for a company produc…
- Kaveri Electricals uses ABC. Overheads: Material handling ₹2,40,000 (driver: 800 material movements) and Quality inspection ₹1,80,000 (drive…
- Which of the following is a limitation of Activity Based Costing rather than a benefit?