Skip to content

FRM Part I · FRM Exam Part I · Machine-Learning Methods

Two PCA eigenvectors are computed on a covariance matrix of returns for 3 assets. The first principal component has eigenvalue 0.09 and the second 0.01, and the third 0.00 (the assets satisfy an exact linear relationship). The first component's loadings are (0.6, 0.8, 0.0). A portfolio holds 1 unit of the component score. If the score for a given day equals 2.0 standard deviations of the first component, what is the implied daily standard deviation of the component and the resulting score value?

The component's standard deviation is 0.30, because its variance equals the eigenvalue 0.09 and the square root is 0.30. A score of 2.0 standard deviations is therefore 0.60. Treating 0.09 as volatility mistakes variance for standard deviation.

  1. AStandard deviation 0.30; score value 0.60Correct
  2. BStandard deviation 0.09; score value 0.18
  3. CStandard deviation 0.30; score value 2.00
  4. DStandard deviation 0.09; score value 0.30

Explanation

The variance of a principal component equals its eigenvalue, so the standard deviation is sqrt(0.09) = 0.30. A score of 2.0 standard deviations is 2 x 0.30 = 0.60. Using 0.09 as the standard deviation confuses variance with volatility. Check: 0.60/0.30 = 2.0.