Skip to content

FRM Part II · FRM Exam Part II · The Art of Term Structure Models: Drift

Under a CIR model with k = 0.4, long-run mean θ = 6% and a current short rate of 4%, what is the expected change in the short rate over the next quarter (dt = 0.25), ignoring the volatility term?

The expected change is k(θ − r)dt, which is 0.4 × 2% × 0.25 = 0.2%, an increase of 20 basis points. The rate sits below its 6% mean, so the drift is upward. The 80 bp figure is the annual drift and is not scaled to a quarter.

  1. AIncrease of 20 basis pointsCorrect
  2. BIncrease of 80 basis points
  3. CDecrease of 20 basis points
  4. DIncrease of 50 basis points

Explanation

The expected change is k(θ − r)dt = 0.4 × (0.06 − 0.04) × 0.25 = 0.002, or +20 bp. The rate is below its long-run mean, so the drift is positive. The 80 bp option is the annual drift and ignores the quarterly time step.

Did you get it right without looking?

One question tells you little. A timed set on The Art of Term Structure Models: Drift shows your real accuracy, how long you take and where you lose marks.

More The Art of Term Structure Models: Drift questions