Skip to content

FRM Part II · FRM Exam Part II · Managing Nondeposit Liabilities

A bank issues USD 200 million of 5-year fixed-rate notes at 6.00% when its funding spread to the 5-year benchmark is 150 bp. The 5-year benchmark yield is 4.50%. Its liquidity transfer pricing desk includes a term liquidity premium of 40 bp in the 5-year funding curve. Management is also considering a callable structure. Under a stress scenario, the bank's spread widens to 300 bp on the benchmark of 4.50%. What is the additional annual interest cost, in USD million, if the same USD 200 million had to be issued then rather than now?

The additional annual cost is USD 3.0 million. The spread widens from 150 bp to 300 bp, a 150 bp increase, with the benchmark unchanged. Applied to USD 200 million, this gives 1.5% times 200 million. The 40 bp term premium is already embedded in the existing spread and is not added again.

  1. AUSD 3.0 millionCorrect
  2. BUSD 3.8 million
  3. CUSD 6.0 million
  4. DUSD 2.2 million

Explanation

Stress spread rises from 150 bp to 300 bp, an increase of 150 bp (benchmark unchanged). Additional cost = 200 million x 1.50% = USD 3.0 million per year. The 40 bp premium is already inside the 150 bp spread and the 6.00% coupon, so adding it again (3.8) or using the total new cost minus a wrong base is incorrect.

Did you get it right without looking?

One question tells you little. A timed set on Managing Nondeposit Liabilities shows your real accuracy, how long you take and where you lose marks.

More Managing Nondeposit Liabilities questions