FRM Part II · FRM Exam Part II · Contingency Funding Planning
A bank's CFP relies on a committed credit line from a correspondent bank as a contingent source. Which concern is most important when assessing whether to count this line toward stress liquidity?
The key concern is reliability under stress: the provider may face stress at the same time, and clauses such as material adverse change conditions may block drawdown. A line that cannot be counted on when needed should not be treated as a dependable contingent source.
- AWhether the line's interest rate is below the bank's average deposit cost
- BWhether the line's counterparty may be stressed at the same time and whether the line contains material adverse change clauses or conditions that restrict drawdownCorrect
- CWhether the line was originally arranged before the bank's last audit
- DWhether the line is denominated in the bank's reporting currency only
Explanation
A contingent line is valuable only if it is reliably available in stress. Wrong-way correlation with the provider and conditions allowing the lender to refuse or cancel funding undermine reliability. Pricing, audit timing and currency are secondary.
Did you get it right without looking?
One question tells you little. A timed set on Contingency Funding Planning shows your real accuracy, how long you take and where you lose marks.
More Contingency Funding Planning questions
- A mid-sized bank is drafting its contingency funding plan (CFP). Which feature best reflects sound governance of the plan?
- A bank projects 30-day stressed cash outflows of USD 900 million. Its unencumbered assets are: USD 300 million cash at the central bank, USD…
- Which practice best supports the usability of a bank's liquidity buffer in a CFP?
- A bank's reverse stress test for liquidity is being reviewed by the risk committee. Which description best characterizes a reverse liquidity…
- A bank's CFP lists a 30-day stress in which it expects to lose access to unsecured wholesale funding. Under supervisory guidance, which appr…
- During the 2007-2009 crisis, several institutions that funded long-term assets with short-term wholesale borrowings found they could not rol…