FRM Part I · FRM Exam Part I · Calculating and Applying VaR
A call option is worth USD 8.00 with the stock at USD 100. Its delta is 0.60 and gamma is 0.02. A full revaluation after the stock falls to USD 95 gives an option value of USD 5.20. How does the delta-gamma estimate of the loss per option compare with the full revaluation loss?
The delta-gamma estimate is a loss of USD 2.75 per option, while full revaluation shows a loss of USD 2.80. The approximation therefore understates the loss by USD 0.05, because it ignores higher-order terms beyond gamma.
- AIt estimates a loss of USD 2.75, understating the full revaluation loss by USD 0.05Correct
- BIt estimates a loss of USD 2.75, overstating the full revaluation loss by USD 0.05
- CIt estimates a loss of USD 3.00, overstating the full revaluation loss by USD 0.20
- DIt estimates a loss of USD 2.75, understating the full revaluation loss by USD 0.25
Explanation
Delta-gamma change = 0.60 × (−5) + 0.5 × 0.02 × 25 = −3.00 + 0.25 = −2.75. Full revaluation loss = 8.00 − 5.20 = 2.80. The approximation therefore understates the loss by 0.05, as higher-order terms are ignored. The 3.00 figure is the delta-only estimate, which would overstate by 0.20.
Did you get it right without looking?
One question tells you little. A timed set on Calculating and Applying VaR shows your real accuracy, how long you take and where you lose marks.
More Calculating and Applying VaR questions
- A trader is short 500 call options on a stock trading at USD 100. Each option has delta 0.50 and gamma 0.03. The risk manager's worst-case o…
- A risk analyst estimates the 1-day 99% VaR of a portfolio using Monte Carlo simulation. She generates 10,000 simulated daily P&L outcomes an…
- A bank runs a 99% one-day VaR model and backtests it over 250 trading days. The 99% VaR is exceeded on 7 days. Under the Basel traffic-light…
- A trader holds a long call option on a stock priced at USD 100 with delta 0.60. The stock's daily volatility is 2%. Using the delta-normal a…
- When simulating correlated risk factors for a Monte Carlo VaR of a portfolio with two assets, which step correctly introduces the desired co…
- A portfolio manager reports a one-day 99% VaR of USD 2.0 million. Which statement correctly interprets this figure?