ACCA Applied Knowledge · Management Accounting · Standard costing system
A company sets its standard labour rate using a standard that assumes all staff are paid at grade B, $12 per hour. Production in the period required 1,000 standard hours and the actual 1,000 hours worked were paid at an average $13 per hour because grade A staff at $15 were used. Which statement about the standard cost card is correct?
The labour rate variance is $1,000 adverse, being 1,000 hours times the $1 excess over the $12 standard rate. It arises because a costlier grade mix was used than the standard assumed, so it is potentially controllable and should be investigated rather than simply absorbed into a new standard.
- AThe standard should be revised immediately to $13 per hour with no further analysis
- BThe $1,000 adverse rate variance arises because the standard assumed a different grade mix and is potentially controllableCorrect
- CThe $1,000 favourable rate variance arises because more skilled staff were used
- DThe variance is a usage variance because the hours worked equal the standard hours
Explanation
Rate variance = (12 - 13) x 1,000 = $1,000 adverse. It results from using a more expensive grade than the standard assumed, so management can investigate whether it was controllable. It is a rate, not efficiency, variance since hours equal standard. Changing the standard automatically would hide the cause.
Did you get it right without looking?
One question tells you little. A timed set on Standard costing system shows your real accuracy, how long you take and where you lose marks.
More Standard costing system questions
- A manager receives an adverse material price variance and an favourable material usage variance on the same product. Which of the following …
- Which standard is most likely to be used on a standard cost card if management wants the standards to motivate employees to achieve a stretc…
- Dunmore Ltd has a standard of 3 kg of material per unit at $5 per kg. In March it produced 2,000 units and used 6,300 kg of material, which …
- Harlan Co uses standard absorption costing with fixed overheads absorbed on direct labour hours. Budget: 10,000 units, 2 hours per unit, fix…
- Keswick Co budgeted sales of 4,000 units at a standard selling price of $50 and a standard variable cost of $30 per unit. Actual sales were …
- Budgeted output was 2,000 units with a standard variable overhead of $5 per labour hour and 2 hours per unit. Actual output was 1,900 units,…