Skip to content

FRM Part I · FRM Exam Part I · Interest Rate Futures

A firm holds $90 million of corporate bonds with a modified duration of 4.5. Historical regression suggests the bond yield changes by 1.2 times the change in the yield underlying the hedging futures. The futures price is $108,000 per contract with a duration of 6.0. To minimize the variance of a duration-based hedge that adjusts for this yield beta, what position should be taken?

Short 750 contracts. The unadjusted hedge is 625 contracts, and because the bond yield moves 1.2 times the futures yield, the hedge must be scaled up by 1.2 to 750. The position is short because the bond portfolio loses when yields rise.

  1. AShort 750 contractsCorrect
  2. BShort 625 contracts
  3. CShort 521 contracts
  4. DLong 750 contracts

Explanation

Multiply the standard hedge by the yield beta: N = 1.2 × (90,000,000 × 4.5)/(108,000 × 6.0) = 486,000,000/648,000 = 750. The portfolio loses when yields rise, so the position is short. Short 625 omits the beta. Short 521 divides by the beta instead of multiplying. Long 750 has the wrong sign.

Did you get it right without looking?

One question tells you little. A timed set on Interest Rate Futures shows your real accuracy, how long you take and where you lose marks.

More Interest Rate Futures questions