FRM Part I · FRM Exam Part I · Modeling Non-Parallel Term Structure Shifts and Hedging
A fund manager holds a bond portfolio with a DV01 of $45,000 and wants to reduce this to a target DV01 of $10,000 using Treasury futures. Each futures contract has a DV01 of $90. Approximately how many futures contracts should be sold?
About 389 contracts should be sold. The manager needs to remove $35,000 of DV01 (45,000 minus the 10,000 target), and each contract offsets $90, so 35,000 divided by 90 is roughly 389. Selling 500 would hedge the full exposure and overshoot the target.
- A389Correct
- B500
- C111
- D194
Explanation
The DV01 to remove is 45,000 - 10,000 = $35,000. Dividing by $90 per contract gives 388.9, or about 389 contracts sold. Selling 500 would remove the entire DV01 and not just the targeted reduction.
Did you get it right without looking?
One question tells you little. A timed set on Modeling Non-Parallel Term Structure Shifts and Hedging shows your real accuracy, how long you take and where you lose marks.
More Modeling Non-Parallel Term Structure Shifts and Hedging questions
- In the key rate shift technique applied to a spot rate curve, the 5-year key rate is shifted by 1bp, with adjacent key rates at 2 years and …
- A risk manager hedges a bond portfolio against the first two principal components of yield curve changes, which are interpreted as a level s…
- A fund holds a bond portfolio with a DV01 of $48,000. It hedges with Treasury futures that have a DV01 of $80 per contract, assuming paralle…
- Which statement about key rate exposures is correct?
- In a principal components analysis (PCA) of historical changes in par or spot rates across the maturity spectrum, the first three components…
- A bond portfolio has key rate '01s of USD 150 at the 2-year point and USD 450 at the 10-year point, and no other exposure. A trader wants to…