Skip to content

CMA Intermediate · Operations Management and Strategic Management · Designing of Operational Systems and Control

A manufacturer of automobile components produces a wide variety of low-volume parts, each needing a different sequence of machines. Which facility layout is most suitable?

A process (functional) layout is most suitable because the firm makes many different low-volume parts with varying machine sequences. Grouping similar machines together gives the flexibility to route each job differently, whereas a product layout suits standardised high-volume production with one fixed sequence.

  1. AProduct (line) layout
  2. BProcess (functional) layoutCorrect
  3. CFixed-position layout
  4. DCellular layout dedicated to a single product

Explanation

High variety and low volume with differing routings call for grouping similar machines together, which is the process layout. A product layout suits standardised, high-volume output with a fixed sequence, so it is wrong here.

Did you get it right without looking?

One question tells you little. A timed set on Designing of Operational Systems and Control shows your real accuracy, how long you take and where you lose marks.

More Designing of Operational Systems and Control questions